My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RJM DESIGN GROUP, INC.
Clerk
>
Contracts / Agreements
>
R
>
RJM DESIGN GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 8:17:00 AM
Creation date
6/13/2023 8:31:28 AM
Metadata
Fields
Template:
Contracts
Company Name
RJM DESIGN GROUP, INC.
Contract #
A-2023-089-07
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
9/30/2025
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bell Gardens Aquatics Center <br />Bell Gardens, CA <br />Project Start/End Dates: Jan 2021 - In progress Client Reference <br />Project Size: 2.1 Acres Rozanne Adanto, <br />Design Cost: $1.6M Director of Recreation & Community Services <br />Construction Cost: $1 BM City of Bell Gardens <br />phone: (562) 806-76SO I email: RAdanto@bellgardens.org <br />Grissel Chavez <br />Public Works Director <br />email: gchavez@bellgardens.org <br />Project Summary <br />The Bell Gardens Aquatic Center located in Ford Park was built in 1959 and was forced to shut <br />down in 2017 due to failing infrastructure, several maintenance issues and non-compliance to <br />new building codes. The City of Bell Gardens solicited architectural design teams to renovate the <br />facility and bring up to code. RJM and their host of selected consultants won the project and are <br />currently in the process of turning this facility into a state-of-the-art aquatic center. <br />New programming includes new pool house, recreational and competitive swim programs, <br />water fitness, water safety as well as learning and education. Site amenities include a 50-meter <br />competition pool, therapy pool, splash pad, and waterslide. Other amenities include cabana <br />areas, picnic areas, terraced lawn space, trees for shade, outdoor fireplace and seating areas, <br />spectator seating, covered dry land training areas, new landscape and perimeter fencing are also <br />included. Along with these improvements, the aquatic area has more than doubled in size to cater <br />to all the needs for the Community of Bell Gardens. <br />Project Team Ilk <br />Principal: Larry Ryan Mir <br />DESIGN <br />Project Manager: Eric Chastain nn GROUP <br />J Landscape Architect: Tyler Page 1 r 1 <br />City of Santa Ana • On -Call Landscape Architectural Services 121 <br />
The URL can be used to link to this page
Your browser does not support the video tag.