My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STUDIO ONE ELEVEN
Clerk
>
Contracts / Agreements
>
S
>
STUDIO ONE ELEVEN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:27:12 PM
Creation date
6/13/2023 8:31:54 AM
Metadata
Fields
Template:
Contracts
Company Name
STUDIO ONE ELEVEN
Contract #
A-2023-089-09
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
4/18/2025
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: ASCBD79E-49CB-49A9-BE5B-498A02933D51 <br />George Washington Carver Park Renovation <br />Los Angeles, California <br />Basketball <br />Courts <br />Community Building <br />b'u <br />Te <br />Exploring the connections that enable curiosity, education <br />and play to honor the innovations of George Washington <br />Carver. <br />This $1.5 million renovation project introduces bold new play equipment and <br />colorful poured in place surface patterns that reflect the spirit of experimentation <br />inspired by the plants cultivated in crop fields by George Washington Carver <br />such as peanuts, sweet potatoes and soy beans. The design incorporates <br />accessibility improvements, new lighting, site furnishings, planting and <br />stormwater upgrades to create exciting play -learning environments that enable <br />multiple age groups of children to explore ideas through interactive play. The <br />organic forms and layouts support a series of multi sensory spaces aimed to <br />provide a variety of learning experiences and opportunities to define motor <br />skills. The project documentation has been submitted for permit review with <br />construction expected to begin Summer 2023. <br />Client: County of Los Angeles Department of Parks and Recreation <br />Contact: Jorge Gutierrez, PLA, Project Manager <br />jgutierrez2@parks.lacounty.gov, (626) 588-5325 <br />Completed: 2022 - current <br />IP Consultant Project Manager: Albert Hernandez <br />
The URL can be used to link to this page
Your browser does not support the video tag.