Laserfiche WebLink
TAMIEN PARK, SAN JOSE <br />Project Description: Verde Design was selected by the City <br />of San Jose (City) to provide two concept plans, a preferred <br />concept, construction documents, bidding, and construction <br />assistance for the City's Tamien Park. Included in Phase <br />1 of the 3.67-acre park design, is a new parking lot, a pre- <br />fabricated restroom/storage building, security lighting with <br />power outlets, shade structures, picnic and play opportunities. <br />Additional features of the park include a post -tension slab <br />basketball court, synthetic turf volleyball court, youth play <br />area, game tables, ornamental fencing, stone pilasters, <br />signage, pervious and impervious paving, site -specific <br />improvements, drought -tolerant planting, and an MWELO- <br />compliant pump and irrigation system that is designed to be <br />switched over to recycled water when it becomes available. <br />In Spring 2021, Verde Design completed Phase II additions <br />to the park, which included a natural grass multi -use field <br />with accompanying shade structures, perimeter all-weather <br />walking/running path, and field netting. An outdoor fitness/ <br />exercise area is provided with additional seating and shade. <br />The park is designed to have direct linkage to the train station <br />upon build out. A perimeter pathway encompasses the new <br />field with raised planting beds. A solar lighting was also <br />installed for safety and emergency lighting. <br />Program: <br />Phase I <br />• Play area and custom playhouse and features <br />• Picnic and seating areas <br />• Basketball court and synthetic turf volleyball court <br />• Pathways, raised planters with seat walls <br />• Specialty fencing, custom site furnishings, and lighting <br />• Pre -fabricated restroom/storage building <br />• Parking lot with permeable paving <br />Phase II <br />• Natural grass multi -use field with field fencing <br />• All-weather perimeter walking/running path <br />• Exercise/fitness area with shade structures <br />• Solar lighting <br />Services: Conceptual design, design development, <br />construction and bid documents, specifications, cost <br />estimates, bidding, and construction administration services <br />Size: 3.6 acres total <br />Client: City of San Jose <br />Chris Mastrodicasa, Landscape Architect <br />200 East Santa Clara Street, 6th Floor <br />San Jose, CA 95113-1905 <br />408.535.8416 1 chris.mastrodicasa@sanjoseca.gov <br />Consultant PM: Todd Young <br />Construction Cost: <br />• Phase L $2.8 million <br />• Phase ll: $2.1 million <br />Schedule: <br />• Phase I: Construction completed August 2017 <br />• Phase II: Construction completed June 2021 <br />SPORT PLANNING & DESIGN is <br />