My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTHERN CALIFORNIA EDISON COMPANY (5)
Clerk
>
Contracts / Agreements
>
S
>
SOUTHERN CALIFORNIA EDISON COMPANY (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2023 10:21:39 AM
Creation date
6/16/2023 10:20:44 AM
Metadata
Fields
Template:
Contracts
Company Name
SOUTHERN CALIFORNIA EDISON COMPANY
Contract #
N-2023-146
Agency
Public Works
Expiration Date
6/30/2023
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Throughout the duration of the License Agreement, the Licensee shall: <br />a) Cover all stockpiles that are not actively being used or scheduled to be used within a <br />seven (7) day period. Additionally, all stockpiles shall be covered prior to the onset <br />of precipitation. Licensee shall ensure that stockpile coverings are installed securely <br />to protect from wind and rain. Licensee shall only be allowed to stockpile <br />construction materials or sediment that is directly related to their City of Santa Ana <br />Capital Improvement Project. <br />b) Maintain effective Tracking control BMPs to prevent off -site sediment tracking from <br />the License Area. <br />c) Maintain effective Sediment control BMPs along the entire perimeter of the License <br />Area, at all adjacent stoma drain inlets, and on all non -active slopes, as appropriate. <br />d) Sweep the street, sidewalk, and parkway adjacent to the License Area at the end of <br />the working day and prior to forecasted rain events. <br />e) Use a dumpster or appropriate waste receptacle to discard of all trash and debris. <br />Dumpsters and waste receptacles shall be covered prior to the onset of precipitation. <br />f) Implement Wind Erosion Control BMPs (dust control), as appropriate, per the WE-1 <br />detail provided in the California Stormwater Quality Association (CASQA) <br />Stormwater BMP Handbook for Construction. <br />g) Remove graffiti on the fence or green screen within one (1) day of notification by the <br />City. <br />h) Repair vandalism to fence or green screen within one (1) day of notification by the <br />City. <br />Remove weeds or vegetation growing within License Area or around perimeter within <br />seven (7) days of notification by the City. <br />Within fourteen (14) days of vacating the License Area, the Licensee shall clean up the License <br />Area as outlined below: <br />a) Remove all trash, debris, sediment, stockpiles, and construction materials from the <br />License Area. <br />b) Remove old and/or damaged sediment control BMPs from the License Area and <br />install new sediment control BMPs along the entire perimeter of the License Area. <br />Appropriate sediment control BMPs include straw wattle, gravel bag berm, or silt <br />fence. Licensee shall install sediment control BMPs per the SE-5, SE-6, or SE-1 <br />details provided in the California Stormwater Quality Association (CASQA) <br />Stormwater BMP Handbook for Construction. <br />c) Remove Tracking Control BMPs from the License Area. <br />d) Cover the surface of the entire License Area with two (2) inches of three-quarter <br />(3/4) inch diameter gravel. <br />License Area clean up shall be completed to the sole satisfaction of the City no later than <br />the times specified in the License as stated in paragraph 1 above, and the License shall be <br />extended to such time for the limited purpose of allowing the clean up to be completed. <br />4. Damage. In the event that Licensee damages any portion of the License Area or the <br />improvements or equipment therein, Licensee shall immediately repair the damage at Licensee's sole cost. <br />Alternatively, the City may, at its election, repair the damage in which case Licensee shall reimburse the <br />City for its cost within fifteen (15) days of receipt of written demand from City. <br />5. Licensee Parties. Licensee, together with its employees, subcontractors, agents, <br />representatives, and all persons entering the License Area, by or through or at the direction of Licensee, are <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.