My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-06-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/20/2023 Regular
>
Agenda Packet_2023-06-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 8:27:38 AM
Creation date
6/16/2023 12:21:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
6/20/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1898
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Relevant Project Experience <br />The following list of projects summarizes some of our recent project experience. <br />Project Name: Centennial Park Lake Renovation <br />Date of Services: 2012-Current �,, ORANGE <br />Contract Value: $50,000 3r� G <br />Client Reference: City of Santa Ana $ <br />Suzi Furjanic <br />Associate Park and Landscape Planner <br />714.571.4241 <br />sfurjanic@santa-ana.orj� <br />Key Staff: Jonis Smith, PE; Tim Muli, PE <br />Description of Project: Mr. Smith served as project manager and lead project engineer for the Centennial Park Lake <br />Renovation Project. Mr. Smith led the design team that provided all design and engineering services for the <br />Centennial Park Lake Renovation project. Mr. Smith and Tim Muli are currently providing bid support and <br />construction support service to the City of Santa Ana for the construction of the proposed lake renovation <br />improvements. The design team prepared construction documents for the lake water quality system (biofilters, <br />wetlands), lake edge modifications, biological vector control features, lake pump stations, water features (jets), and <br />lake appurtenances. Centennial Park Lake is an 8-ft deep, 9.5-acre lake that was constructed in 1978. The design <br />team performed a study of the lake to identify the deficiencies of the lake in a separate project. Once the deficiencies <br />were identified the City of Santa Ana commissioned a project to prepare construction documents to implement the <br />necessary remediation measures and to improve the lake and park in the vicinity of the lake <br />:TY F AI�TA A A <br />f30 <br />Srrm r , <br />u--usr7 <br />.. <br />U—N1117-1 i <br />MI <br />.POWERS <br />a <br />v 77�❑e <br />Thornton Pa y ounce -1111tUIIon Study and Renomrium 14 <br />17 — 37 6/20/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.