Laserfiche WebLink
F. Schedule <br />JS&TM hereby assures the City of JS&TM's ability and availability to complete the scope of work. We will complete studies, <br />final plans, specifications and estimates on or before October 23, 2023. JS&TM has designated Jonis Smith, PE as the <br />Project Manager on this project. He will be fully committed and available to ensure that all City deliverables for this project <br />are submitted on time. Jonis will be supported by Tim Muli, PE in the design process, together with two dedicated <br />designers. Our current and projected workload will not prohibit delivery of the project on schedule. The following Figure-2, <br />Project Schedule, illustrates our projected project milestones. <br />G. References <br />Our Principal Engineers have been servicing public agency clients in Southern California for a combined total of 48- <br />years. We have numerous public agency references that have recently worked directly with J. Smith & T. Muli, Inc. <br />and individually with Mr. Smith and Mr. Muli. We have provided five (5) public agency references below: <br />Public Entity Reference-1: <br />Name of Project: Haigh Road Drainage Channel Improvements Project <br />Date of Services: <br />Contract Value: <br />Public Agency Reference <br />i.:. <br />. IN 0031 framsi. <br />P II R I 1 f- w n R K 5 <br />Key Staff: <br />2017 — 2019 <br />$320,000 <br />City of Santa Ana <br />Nader Heydari, PE <br />Director of Public Works <br />805.449.2392 <br />nheydari@toaks.org <br />Tim Muli, PE, Jonis Smith, PE. <br />Public Entity Reference-2: <br />Name of Project: Pacific Arroyo Community <br />The city team had a great experience with Tim Muli <br />on the complex Haigh Road Storm Drain Project, <br />notably on his efforts leading up the design and <br />engineering for the project, including the utility <br />coordination and public outreach for the project. He <br />also played a key role in support ensuring the <br />project was completed successfully with his strong <br />support during the construction phase of the <br />project. _ <br />Date of Services: 2022 — Current <br />Contract Value: $80,000 <br />Public Agency Reference: Ventura County Watershed Protection District <br />Key Staff: <br />Masood Jilani, PE <br />Engineering Manager <br />805.654.2029 <br />Masood.iilani@ventura.org <br />Jonis Smith, PE and Tim Muli, PE <br />Nader Heydari <br />Deputy Director / City Engineer <br />City of Santa Ana <br />Thornton Pa y ounce -111itluirion Study and Renomrium 17 <br />17 — 40 6/20/2 <br />