My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-06-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/20/2023 Regular
>
Agenda Packet_2023-06-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 8:27:38 AM
Creation date
6/16/2023 12:21:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
6/20/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1898
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Public Works Agency <br />Quotation: Q-145097-20230522-1026 <br />Sales and <br />Service <br />EXHIBIT 1 <br />Item <br />Description <br />Qty <br />UL1008 3 - Cycle Withstand Ratings <br />Transfer Mode - In - Phase Transition <br />Poles - 3 (Solid Neutral) <br />Frequency - 60 Hz <br />System - 3 Phase, 4-Wire (Solid or Switched Neutral) <br />Voltage - 480 Volts AC <br />PC80 Control <br />Integrated High Accuracy Power Quality Metering <br />Genset Starting Battery-24VDC <br />Standard Customer 1/0 <br />Transfer Switch Warranty - 2 Year Comprehensive <br />Packing - Wooden Crate <br />AFTERTREATMENT <br />1 <br />Freestanding Load bank <br />1 <br />2 <br />JM Diesel Particulate Filter ( Shipped Loose) <br />1 <br />Other Items <br />1 <br />Service - start up & testing <br />1 <br />2 <br />Freight & other charges <br />1 <br />TOTAL: $ 265,900.00 <br />OPTIONS: <br />ADDER: <br />Steel Sound Attenuated Level 2 Enclosure w/ support frame $77,594 <br />Spare parts: Air filter/oil filter/fuel filters/crankcase vent filters (4 Sets) $800 <br />Quote value does not include any tax. <br />EXCEPTIONS AND CLARIFICATIONS: <br />This quote was based on verbal requests and this package may or may not fit the owner's application. However, if unforeseen design <br />changes are required, please notify us right away. <br />Offloading, installation, permits, fuel, and fuel for testing is to be provided by others. <br />All external exhaust piping by others. <br />All external fuel piping pumps by others. <br />Providing an open generator design with no housing,see adder for Steel Sound Attenuated Enclosure <br />Lead times subject to change. <br />Aftertreatment installed by others. <br />LEAD TIME: <br />Please note the following: The current lead time on the Generator is 41-62 weeks after approved submittals. <br />Please note the following: The current lead time on the ATS is 9-11 weeks after approved submittals. <br />Please feel free to contact me if you require any additional information; or if you have any further questions or concerns that I may be of <br />assistance with. <br />Thank you for choosing Cummins. <br />Submitted by: <br />Quotation: Q-1 �1P V42-1026 12 - 4 6/20/2023 <br />Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.