Laserfiche WebLink
PROJECT TITLE: <br />Bristol St Rehab: Santa Clara to <br />Memory Ln <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP A <br />N <br />/ <br />w <br />: <br />E�s <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 23/24CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps along <br />Bristol Street between Santa Clara Avenue and Memory Lane. <br />PROJECT NEED: <br />This segment of roadway has been identified as a high priority by the <br />City's Pavement Management System. The pavement is deteriorating <br />Idue to weather, age, and heavy usage. Some of the adjacent curbs, <br />gutters, driveway approaches, curb ramps, and sidewalks are also in <br />various states of disrepair and require replacement. <br />PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />Construction 1,480,000 - - - - - - <br />TOTAL 1,480,000 - - - - - - <br />SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />RMRA SB1 1,480,000 - - - - - - <br />TOTAL 1,480,000 - - - - <br />DIVISION: <br />C/P Engineering <br />CONTACT: <br />Sean Thomas, Senior Civil Engineer <br />DATE: <br />20-Jun-2023 <br />City Council 27 — 13 6/20/2023 <br />