My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-06-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/20/2023 Regular
>
Agenda Packet_2023-06-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 8:27:38 AM
Creation date
6/16/2023 12:21:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
6/20/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1898
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Local Signal Synchronization Plan <br />Similar to this agreement, Santa Ana has maintenance agreements with the neighboring cities <br />of Costa Mesa, Garden Grove, Orange, Tustin and Fountain Valley to maintain and operate <br />signals that reside in both City limits. Since then, the City has been active in replacing outdated <br />equipment and upgrading traffic signal infrastructures to help achieve its goals of maintaining a <br />safe and efficient network of streets. <br />As part of the effort to maintain traffic flow and reduce congestion, the City actively monitored <br />and synchronized all of its arterial streets including synchronization on all major arterials in the <br />City in 2004 and again in 2010. Since then, the City has participated in numerous OCTA Regional <br />Traffic Signal Synchronization Program (RTSSP) corridors. The City fully supports and commits to <br />working with OCTA and other local agencies to maintain Regional traffic synchronization on all <br />arterials in the OCTA Regional Traffic Signal Synchronization Program. <br />The recent completed RTSSP corridors in City of Santa Ana include: <br />• Bolsa St/First St Corridor 2015 <br />• Edinger Ave Corridor 2015 <br />• Grand Ave Corridor 2018 <br />• Bristol St Corridor 2018 <br />• Harbor Blvd Corridor 2018 <br />• Westminster Ave/ 17th St 2019 <br />• Fairview St Corridor in 2020 <br />• Main St Corridor 2021 <br />• Garden Grove Blvd/ Memory Ln <br />2021 <br />• Bear St Corridor 2022 <br />Page 4 i 2023 <br />City Council 28 — 58 6/20/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.