My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-06-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/20/2023 Regular
>
Agenda Packet_2023-06-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 8:27:38 AM
Creation date
6/16/2023 12:21:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
6/20/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1898
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Local Signal Synchronization Plan <br />7. Warner Ave Corridor: This project will soon be in construction. The upgrades include <br />upgrade all controllers to ATC, install/upgrade CCTV cameras and video detection cameras, <br />install conduit and fiber optic cable, Ethernet switches, Bluetooth travel systems, replace <br />traffic signal cabinet at 2 locations, ATMS License expansion and Signal Performance <br />Measures. <br />8. MacArthur Blvd Corridor: This project will soon be in construction. The upgrades include <br />upgrade all controllers to ATC, install/upgrade CCTV cameras and video detection cameras, <br />install conduit and fiber optic cable, Ethernet switches, Bluetooth travel systems, replace <br />traffic signal cabinet at 3 locations, ATMS License expansion and Signal Performance <br />Measures. <br />9. Segerstrom/Dyer Corridor: This project will soon be in construction. The upgrades include <br />upgrade all controllers to ATC, install/upgrade CCTV cameras and video detection cameras, <br />install conduit and fiber optic cable, Ethernet switches, and Signal Performance Measures. <br />10. 1StSt / Bolsa Ave Corridor: This project will soon be in construction. The upgrades include <br />upgrade all controllers to ATC, install/upgrade CCTV cameras and VDS, install APS systems, <br />install conduit and fiber optic cable, Ethernet switches, replace traffic signal cabinet with <br />ATCC cabinets at 5 locations, and Signal Performance Measures. <br />11. Euclid St Corridor: This project will begin design. The upgrades include upgrade all <br />controllers to ATC, install/upgrade CCTV cameras and VDS, install APS systems, install EVP, <br />Ethernet switches, Signal Performance Measures and TMC hardware upgrades. <br />Page 37 ' 2023 <br />City Council 28 — 91 6/20/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.