Laserfiche WebLink
Resumes for the proposed team members have been provided in the following pages. <br />Project Man> er & City Point-of-Contac <br />Joe will serve as Project Manager. He has over 34 years of experience <br />on civil on -call contracts with broad knowledge of street and highway <br />improvement projects. Most of Joe's career has involved work for Orange <br />County municipalities, including the City of Santa Ana. He has extensive <br />EXPERIENCE knowledge of all elements of civil assignments and established relationships <br />with local agencies, utilities, and stakeholders. Joe has completed <br />Years numerous projects, including roadway and street improvements, ADA <br />SPECIALTY EXPERTISE enhancements, complete streets, traffic, water resources, utility planning, <br />O City of Santa Ana lighting, city, and park facilities. <br />Expertise Relevant Project Experience <br />O Project Management ♦ Thornton Park Neighborhood Water Main Replacement, City of Santa <br />O Multi -disciplinary Team Ana, CA: Joe served as Project Manager for the preparation of construction <br />Leadership documents for the replacement of approx. 7.500 feet of 8-inch water main <br />PROVEN RECORD within nine residential streets in an established neighborhood. He also directed <br />base map preparation, engineering design, specifications and construction cost <br />O Coming in Under Budget estimates, as well as day-to-day communication with the City's project manager. <br />and On Schedule ♦ Multiple Street Intersection Improvement Projects, City of Lake Forest, <br />O Issues Resolution CA: Civil engineer for several street improvement projects including widening <br />O Award -Winning Projects of Bake Parkway at Irvine Boulevard, intersection improvements at El Toro <br />EDUCATION Road/Portola Parkway, widening Jeronimo at Lake Forest, intersection <br />BS, Civil Engineering, improvements at Bake Parkway/Toledo Way, and intersection improvements <br />San Diego State University at Los Alisos Boulevard and Rockfield Boulevard. <br />♦ Development Services On -Call Plan Checking Services, City of Anaheim, <br />REGISTRATION CA: Through an on -call contract, Joe led the team in provide plan -check <br />Professional Civil Engineer services catered toward stormwater documentation and private land <br />in CA, No. 51540 development projects within the City. All work was checked for conformance <br />QSD/P in CA, No. 22539 with the City of Anaheim Guidelines and additional ordinances. <br />♦ Ocean Boulevard and Poppy Avenue Street Improvement Project, <br />PROFESSIONAL City of Newport Beach, CA: Joe served as Project Manager for this street <br />AFFILIATIONS rehabilitation and landscape enhancement project which entailed pavement <br />American Public Works reconstruction of 1500 feet of Ocean Boulevard and a complete street <br />Association (APWA) reconstruction of 1350 feet of Poppy Avenue. The sidewalk and landscaping <br />American Society of Civil replacement in the residential parkways of Poppy Avenue was coordinated <br />Engineers (ASCE) with the City staff and residents. RICK provided all civil engineering, <br />Building Industry Associate landscape architecture, and land surveying services for the project. <br />(BIA) Council on SAGE - ♦ Aviation Boulevard Missing Sidewalk Project, City of Manhattan Beach, <br />Board Member CA: Joe is currently serving as the Engineer -of -Work for this CIP project. <br />The project requires the preparation of construction documents to add <br />approximately 600' of sidewalk along the west side of Aviation Boulevard <br />north of 33rd Street. The project requires coordination with the fronting <br />property owner, Right -of -Way acquisition, and extensive utility coordination <br />with SC Gas and SCE. <br />RICK <br />