My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
X ENGINEERING & CONSULTING, INC.
Clerk
>
Contracts / Agreements
>
X
>
X ENGINEERING & CONSULTING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:17:16 PM
Creation date
6/26/2023 4:04:05 PM
Metadata
Fields
Template:
Contracts
Company Name
X ENGINEERING & CONSULTING, INC.
Contract #
A-2023-088-10
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
11/1/2023
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES AND SCHEDULE I SECTION 2 <br />SCOPE OF SERVICES <br />X Engineering & Consulting, Inc. (XEC) is experienced in and prepared to provide the City of Santa Ana with <br />the following requested on -call engineering design services: <br />• Civil design <br />• Land surveying <br />• Hydraulic modeling of the water distribution, storm water, and sewer collection systems <br />• Evaluations, studies and recommendations related to water wells, reservoirs, water treatment systems, <br />disinfection systems, pressure control systems, and sewage lift stations <br />• Electrical and industrial control systems evaluations, studies, drawings, documentation and <br />recommendations <br />• Mapping services <br />• Legal description preparations <br />• Grant -writing services <br />• Environmental/planning support <br />• Construction management support <br />• Pavement management <br />• Special engineering studies / reports / compliance and investigations <br />• Regulatory compliance with federal and state local agencies <br />• Financial / cash flow analysis - public works programs <br />• Assessment and district formation services <br />• Sustainable infrastructure services <br />• Right-of-way studies <br />Upon entering into a contract for a specific scope of work, we model our schedule against our XEC standard <br />Project Management Plan (PMP) seen in the previous section. As seen in the PMP, we prepare an initial <br />project schedule at the Understanding phase and furnish it for the City to review. Utilizing Microsoft Project <br />and holding weekly workload meetings to allocate staff adequately allows us to consistently keep our projects <br />on schedule. Should any deviations from schedule arise as a result of any design changes or project impacts, <br />the City shall be notified immediately. In the event that a project schedule is delayed, XEC utilizes additional <br />staffing and resources, including nights and weekends when needed, to restore the project's timeline. <br />X ENGINEERING & CONSULTING, INC. 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.