My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-07-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
07/18/2023 Regular and Special HA
>
Agenda Packet_2023-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 12:10:15 PM
Creation date
7/12/2023 11:48:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
7/18/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2' <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: <br />20-6964 <br />FREMONT ELEMENTARY AND SPURGEON INTERMEDIATE SRTS <br />Item <br />Description <br />Qty <br />300 <br />Unit <br />LF <br />$ <br />Unit Price <br />Amount <br />15 PCC Curb and Gutter (Type A-2-8) <br />16 <br />PCC Curb and Gutter (Type A-2-6) <br />1,300 <br />LF <br />$ <br />$ <br />�a a <br />17 <br />PCC Curb Crype B-1) <br />30o <br />LF <br />$ <br />$ <br />120 <br />18 <br />PCC Retaining Curb <br />200 <br />LF <br />$ <br />1,50 <br />19 <br />PCC Cross -Gutter (Arterial Street) <br />100 <br />SF <br />$ <br />$ <br />rJ 5 <br />20 <br />PCC Cross -Gutter (Local Street) <br />3,600 <br />SF <br />$ <br />30$ <br />21 <br />PCC Bus Pad <br />100 <br />SF <br />$ <br />/f 7 <br />$ <br />22 <br />Drainage Structure <br />151 <br />SF <br />$ <br />23 <br />Root Shave <br />3 <br />EA <br />$ <br />/5� Q <br />$ <br />24 <br />Furnish and Install New Water <br />22 <br />EA <br />$ <br />Valve Frame and Cover to Finished <br />�� <br />Grade <br />J <br />25 <br />Furnish and Install New Water <br />24 <br />EA <br />$ <br />$ <br />Meter Box to Finished Grade <br />/ 5� <br />26 <br />Adjust Sewer Cleanout to Finished <br />i <br />EA <br />$ <br />$ <br />Grade <br />27 <br />Adjust Sewer and Drainage <br />24 <br />EA <br />$ <br />Manhole to Finished Grade <br />r 7 <br />28 <br />Furnish and Install New 46 Pullbox <br />3 <br />EA <br />$ <br />$ <br />29 Adjust Survey Monument to <br />16 <br />EA <br />$ <br />$ <br />Finished Grade <br />/ �Q Q <br />i <br />30 Tree Removal (Small) <br />2 <br />FA <br />$ <br />$ <br />5 5 a <br />31 Tree Limb Removal <br />1 <br />EA <br />$ <br />QUO <br />32 Stump Removal <br />I <br />EA <br />$ <br />$ <br />700 <br />33 Abandon Water Valve <br />9 <br />EA <br />$ <br />7 -70 <br />$ <br />34 Construct New Fire Hydrant <br />6 <br />EA <br />$ <br />$ <br />Service <br />3 e/ DOQ <br />P-2 of P-21 <br />City Council <br />16-7 <br />7/18/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.