My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-07-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
07/18/2023 Regular and Special HA
>
Agenda Packet_2023-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 12:10:15 PM
Creation date
7/12/2023 11:48:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
7/18/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 5 <br />PROJECT TITLE: <br />Fairview Avenue Rehabilitation: City to <br />Segerstrom <br />PROJECT CATEGORY: <br />Street improvements <br />Artef7al Street Rehabilitation <br />LOCATION MAP 1 <br />r� <br />AGENCY: <br />Public Works <br />16� — <br />City Council <br />CITY OF SANTA ANA FY20/21CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacementfinstallation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps within <br />this segment of roadway. <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has been <br />developed to prioritize and recommend the most cost-effective <br />roadway repairs, and maximize the return from available funding <br />for street pavement. This segment of Fairview Avenue pavement <br />rehabilitation is identified as a high priority in the PMP. <br />PROJECT COSTS FY 20121 FY 21122 FY 22123 FY 23124 FY 24125 FY 25126 FY 26127 <br />Construction Engineering 2,023,389 - - - - - - <br />Design Engineering 165,000 <br />TOTAL 2,188,389 <br />SOURCE OF FUNDS FY 20121 FY 21122 FY 22123 FY 23124 FY 24125 FY 25126 FY 26127 <br />RMRA SB1 2,188,389 - - - - - - <br />TOTAL 2,188,389 <br />DIVISION: <br />Design Engineering <br />16-24 <br />CONTACT: <br />Mike Ortiz, Senior Civil Engineer <br />DATE: <br />23-Mar-2020 <br />7/18/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.