My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-07-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
07/18/2023 Regular and Special HA
>
Agenda Packet_2023-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 12:10:15 PM
Creation date
7/12/2023 11:48:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
7/18/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award Construction Contract with M.S. Construction Management Group <br />July 18, 2023 <br />Page 4 <br />Accounting Unit <br />Fund <br />Accounting Unit - <br />r <br />Year ea <br />- Account No. <br />Description <br />Account No. <br />Amount <br />(Project No.) <br />Description <br />Existing Budget (Excluding Design Engineering) <br />Measure M- <br />Measure M2 <br />2023-24 <br />03217663-66220 <br />Street <br />Competitive Street, <br />$253,472 <br />(CF) <br />(22-6999) <br />Construction <br />Improvements Other <br />Than Buildings <br />Additional Budget <br />01117622-66220 <br />PWA Right -of -Way, <br />2023-24 <br />(22-6999) <br />General Fund <br />Improvements Other <br />$168,053 <br />Than Building <br />Appropriation Adjustment <br />Select Street <br />2023-24 <br />05917660-66220 <br />Select Street <br />Construction, <br />$114,000 <br />(22-6999) <br />Construction <br />Improvements Other <br />Than Buildings <br />Additional Budget/Appropriation Adjustment Total <br />$282,053 <br />Complete Total <br />$535,525 <br />EXHIBIT(S) <br />1. Location Map <br />2. Bid Proposal <br />3. Construction Contract <br />4. Cost Analysis <br />5. CIP Project Sheet <br />Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency <br />Approved By: Kristine Ridge, City Manager <br />City Council 19 — 4 7/18/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.