My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Bristol-Tolliver Street Urban Greening Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/01/2023 Regular and HA
>
Item 12 - Bristol-Tolliver Street Urban Greening Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 4:03:30 PM
Creation date
8/9/2023 3:19:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
12
Date
8/1/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 23/24CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The project will include drought tolerant landscaping, shade trees, <br />recreational features, pedestrian pathways, signage, lighting, picnic <br />benches, a stormwater bioretention basin, and a stormwater capture <br />and reuse system for park irrigation. <br />PROJECT NEED: <br />The project features the transformation of vacant, City-owned parcels <br />into a 1.25-acre new community park. The project helps advance the <br />City's park acreage goal of 3-acres per 1,000 residents and will provide <br />significant recreational and environmental benefits. <br />PROJECT TITLE: <br />Bristol-Tolliver Urban Greening <br />Project <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting <br />Improvements <br />Park Facility <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Craig Foster, NPDES Manager 01-Aug-2023 <br />PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />Construction 3,147,500 ------ <br />Engineering 335,000 ------ <br />Planning 20,000 ------ <br />TOTAL 3,502,500 ------ <br />SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />CNRA Urban Greening Grant 3,502,500 ------ <br />TOTAL 3,502,500 ------ <br />EXHIBIT 3
The URL can be used to link to this page
Your browser does not support the video tag.