My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Award Agreement to SCS Engineers
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/01/2023 Regular and HA
>
Item 14 - Award Agreement to SCS Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 4:04:21 PM
Creation date
8/9/2023 3:27:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
8/1/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> <br />COST OF SERVICE STUDY 22 <br /> <br /> <br />a. Preparation of typical bill comparisons for each proposed rate structure for <br />representative customer classes using the current rate schedules as a <br />baseline. <br />b. Compare customer class and proposed rate structures with neighboring <br />agencies of comparable service area. <br /> <br /> <br />C. DELIVERABLES <br /> <br />Consultant shall deliver at a minimum the following: <br />1. Final Cost of Service Reports <br />a. Digital Copy (PDF) <br />b. Printed and Bound Copies (15) of each <br />2. Proposition 218 Compliant Notice <br />a. Digital Copy (PDF and MS Word) <br />3. Pass-through adjustment calculator <br />a. Digital Copy (MS Excel or similar) <br /> <br />Consultant shall meet with the City to discuss the report’s outcome and explain in detail the <br />full parameters and outcomes discussed in the report. In addition, the Consultant shall meet <br />with the City to review a draft copy of the report before submitting the final report. <br /> <br />IV. PUBLIC MEETINGS & PRESENTATIONS <br /> <br />Consultant shall participate, as requested by City, at both staff and public meetings. Consultant <br />shall expect to make presentations regarding the results of the cost of service study to City <br />executive staff, Mayor and Council and the general public. For purposes of this RFP, Consultant <br />shall be required to attend a minimum six (6) meetings in the range of two (2) – four (4) hours <br />in length in person. <br /> <br />V. KICKOFF MEETING <br /> <br />Consultant shall attend one (1) contract kick-off meeting at the City’s Corporate Yard located <br />at 215 S. Center St., Santa Ana, CA 92703 at which City staff will share contact information, <br />safety and security protocols, and familiarize the Consultant with the City’s sites and equipment. <br /> <br />VI. PROJECT MANAGEMENT & COORDINATION <br /> <br />Consultant shall not proceed with any work without the approval of the City’s designated Project <br />Manager. Consultants shall invoice the City on a monthly basis for all work performed during <br />the period. Each invoice shall be accompanied by a summary of tasks performed, results, and <br />progress on long-term tasks (if any). <br /> <br />VII. MIDTERM REVIEW <br /> <br />The City intends to implement a five-year rate structure as determined appropriate by the <br />results of the cost of service study. Consultant shall perform a midterm review (either at Year <br />2 or 3 of implementation) of the adopted rate structure, revenues and expenditures, and make <br />recommendations/findings as to the need for any midterm rate adjustments to meet the City’s <br />stated goals. The Consultant shall deliver an addendum report to the initial study presenting
The URL can be used to link to this page
Your browser does not support the video tag.