My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Santa Ana Zoo Educational Hub Building Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/01/2023 Regular and HA
>
Item 15 - Santa Ana Zoo Educational Hub Building Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 4:04:43 PM
Creation date
8/9/2023 3:28:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/1/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Poonam Sharma <br />Resume <br />Crossroads Office TI <br />LOC designed and permitted <br />building to be used as offices. <br />the conversion of an industrial <br />Crossroads School for Arts and Science Master <br />plan <br />LOC provided a feasibility study of potential sites for the <br />proposed Performing Arts Campus serving the Crossroads middle <br />and upper school populations. This feasibility established a <br />preliminary program and through careful site analysis identified <br />the most suitable site(s) adjacent to the Crossroads campus with <br />proposed configurations. <br />Crossroads School for Arts and Sciences <br />Performing Arts Campus <br />Based on the Master Plan, LOC developed conceptual floor <br />plans and renderings of a proscenium theater, a black box <br />theater, and a recital hall for fundraising purposes. <br />Crossroads Middle School Renovation <br />LOC designed and permitted the remodel of classrooms and <br />the configuration of disabled access in the Steve Morgan Middle <br />School Building. <br />New Horizons School Westside <br />A master plan and fundraising package for a K-6 Islamic <br />parochial school for 200 students on an urban infill site in west <br />Los Angeles. The existing school occupies the same site in a <br />series of modular buildings as well as an existing apartment <br />building. The school is currently fundraising to develop the site. <br />Alliance Judie Ivie Burton Technology High School <br />LOC is currently working on the design and permitting of a <br />9,450 sf ground up classroom building for the Alliance College - <br />Ready Charter School group of schools. <br />Crossroads Master Plan <br />New Horizons School Westside <br />Crossroads Middle School <br />Alliance College Ready Public Schools, Judie <br />Ivie Technology High School <br />LOC SANTA ANA ZOO 5nntn <br />Architects COMMUNITY HUB BUILIDNG "THE HIVE" RFP <br />March 23, 2023 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.