My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Santa Ana Zoo Educational Hub Building Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/01/2023 Regular and HA
>
Item 15 - Santa Ana Zoo Educational Hub Building Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 4:04:43 PM
Creation date
8/9/2023 3:28:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/1/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The Santa Ana Zoo is seeking proposals for full architectural services to design, permitting, <br />bidding, and construction administration of a building that will occupy the existing campus <br />and contain classroom type spaces along with offices that will form the community hub for <br />the zoo. Users will include field trip students, volunteers for the zoo, and the Friends of the <br />Santa Ana Zoo, a nonprofit entity that supports the Santa Ana Zoo. <br />• The project is to be located in an approximately 9,000 sf of area and in the general area <br />designated on the Masterplan that was provided as part of the RFP. The project is to consist <br />of 6,000 sf of built space of which 3,000 sf would be back of house (including offices and <br />restrooms) and 3,000 sf to be flex space/classrooms. A 1,000 sf patio is also required. <br />• The building siting is defined by two large existing Ficus trees. Design is to provide access <br />to amphitheater, and connect the visitor experience to the interior of the zoo. <br />• The building is to be accessible to visitors inside the zoo, and accessible to staff. <br />• The design of the building is to incorporate an indoor/outdoor feel, lots of light, to be <br />uncluttered with a neutral palate and blend in with the surrounds and respond to the <br />master plan. <br />• The building design should incorporate sustainable practices and use local materials where <br />possible. <br />• Architect will be responsible for providing a full design team including, Civil, Geotechnical, <br />Structural, Landscape, and Mechanical, Electrical, and Plumbing design. <br />LOC SANTA ANA ZOO <br />Architects COMMUNITY HUB BUILIDNG "THE HIVE" RFP <br />March 23, 2023 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.