Laserfiche WebLink
Alliance Burton Tech High School <br />Location: South Los Angeles <br />Client: Alliance College -Ready Charter Schools <br />, ,Or.0 A Df I BURMW r#C.m1�1p1;r Size: 9,400 sf <br />•F_iDEaiY _SCHOOK <br />Budget: $6 Million <br />Projected Completion: December 2024 <br />LOC won the RFP to design a new building to <br />compliment the Alliance College -Ready School's <br />Judie Ivie Burton Technology High School campus. <br />f; Working closely with the school team, LOC designed <br />a two story classroom builidng with a rooptop outdoor <br />- ` space. The project maximizes natural light and view to <br />�- the exterior while making a connection to the existing <br />campus and helping to foster the school's role as a <br />pivotal entity in the South Los Angeles neighborhood. <br />The project is currently in permitting. <br />LOC SANTA ANA ZOO 5nntn <br />Architects COMMUNITY HUB BUILIDNG "THE HIVE" RFP <br />March 23, 2023 <br />33 <br />