Laserfiche WebLink
DocuSign Envelope ID: 8B7C0318-7479-4B72-BDA1-6ADC2B2AFEAB <br />Exhibit A-1 -Revised <br />Amendment 1 <br />City of Santa Ana <br />City of Santa Ana Zoo and Park Projects <br />GF2107-0 <br />Exhibit A-1 Cost Estimate - Revised <br />Amendment 1 <br />Project Elements <br />Total <br />Original <br />General Fund <br />Grant <br />Cost <br />Estimate <br />Revision <br />Revised <br />General Fund <br />Grant <br />City of Santa <br />Ana Funds <br />1. Zoo Project: Planning, Design & Permitting <br />1.1 <br />Design Engineering (Planning) <br />150,125.00 <br />115,125.001 <br />234,995.001 <br />350,120.001 <br />35,000.00 <br />Sub-total—F <br />150,125.00 <br />1 115,125.00 <br />1 234,995.001 <br />350,120.001 <br />35,000.00 <br />2. Park Playground Project: Planning, Design & Permitting <br />2.1 <br />Design Engineering (Planning) <br />194,895.00 <br />1 115,125.001 <br />88,965.001 <br />204,090.001 <br />79,770.00 <br />Sub -total <br />1 194,895.00 <br />1 115,125.001 <br />88,965.001 <br />204,090.001 <br />79,770.00 <br />Non -Construction Sub -total <br />1 345,020.00 <br />1 230,250.001 <br />323,960.001 <br />554,210.001 <br />114,770.00 <br />3. Zoo <br />Project: Construction <br />3.1 <br />Contractor Costs <br />1,535,000.00 <br />1,535,000.00 <br />(119,870.00) <br />1,415,130.00 <br />- <br />3.2 <br />Construction Engineering Construction Management) <br />310,375.00 <br />115,125.00 <br />(115,125.00) <br />- <br />195,250.00 <br />3.3 <br />Contingency <br />234,750.00 <br />234,750.00 <br />234,750.00 <br />- <br />Sub -total <br />2,080,125.00 <br />1,884,875.00 <br />(234,995.00) <br />1,649,880.001 <br />195,250.00 <br />4. Park Playground Project: Construction <br />4.1 <br />Contractor Costs <br />1,535,000.00 <br />1,535,000.00 <br />260,910.00 <br />1,795,910.00 <br />- <br />4,2 <br />Construction Engineering Construction Management) <br />175,605.00 <br />115,125.00 <br />(115,125.00) <br />- <br />60,480.00 <br />4.3 <br />Contingency <br />324,750.00 <br />234,750.00 <br />234,750.00 <br />- <br />90,000.00 <br />Sub -total <br />2,035,355.00 <br />T 1,884,875.00 <br />(88,965.00) <br />1,795,910.001 <br />150,480.00 <br />Construction Sub -total <br />4,115,480.00 <br />1 3,769,750.00 <br />(323,960.00) <br />3,445,790.001 <br />345,730.00 <br />Grand Total <br />$ 4,460,500.00 <br />$ 4,000,000.00 <br />$ - <br />$ 4,000,000.00 <br />$ 460,500.00 <br />*Overhead costs are allowable and generally limited to 15% of total direct costs of the grant. In-service payroll may not include a "billable rate" or <br />administrative cost allocation. <br />**All invoices and receipts for all project expenditures from all funding sources will be retained and made available in the event of any future State Audits. <br />