My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Agreement for Memorial Park and Aquatics Facility Renovation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/15/2023 Regular
>
Item 23 - Agreement for Memorial Park and Aquatics Facility Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 3:46:14 PM
Creation date
8/9/2023 4:37:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23
Date
8/15/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1of10 <br />. , y <br />I <br />I <br />k civi a uatics'c <br />A grove ' <br />ELS and SWA blended this aquatic center's sinuous facility's users was crucial. ELS bisected the one - <br />design into a new park plan (by SWA) that reflects story 13,000-square-foot complex with a 400-foot- <br />city leaders' emphasis on improving walkability, long white steel trellis shade structure. The trellis <br />engagement, and access to fitness. ELS used defines the entry, provides shelter from the sun for <br />community -programming feedback to create multiple those waiting in the entrance queue outside, and <br />pools for lessons, fun -water and therapeutic activities, offers shade along the lap pool on the at -grade deck <br />plus a 50-meter competition pool for swimming and and the 50m pool on the lower deck. The project has <br />diving. Located south of Sacramento, Elk Grove been honored with awards from AIA East Bay and <br />frequently experiences summer high temperatures of CA Park and Recreation Society. <br />more than 100 degrees, thus providing shade for the <br />Completion: 20191 Client Reference: Alvin Wong, Former <br />City Architect, City of Elk Grove, 916.936.6183 <br />2 of 10 <br />I'■ MUN <br />.r <br />rieoll <br />an er I re&ood-city Va. <br />an mammunity college district <br />This new LEED Gold -certified aquatics center replaces provides natural light by day and illuminates the core <br />a 1967-built gym. ELS+SWA linked the new building to by night. This project has received awards from the <br />the existing north forecourt plaza, improving campus Community College Facility Coalition, Silicon Valley <br />connectivity. The facility includes two pools, basketball/ Business Journal, ENR National, ENR California, <br />volleyball courts with retractable bleachers, a weight and DBIA Western Pacific Region, among others. <br />room, dance studios, cafe, and locker room facilities for <br />the men's and women's basketball and volleyball teams. Completion: 20 r, Client Reference: Linda Mateoi, Senior <br />It offers a membership option for the general public, Project Manager, 6, inzzoli - CM for San Mateo County <br />CCD, 650.218.8726, Irizzoli@swinerton.com <br />making it the city's only available public pool. The facility <br />is marked by athree-story-translucent "lightbox" that <br />els+swa <br />
The URL can be used to link to this page
Your browser does not support the video tag.