My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-051 - Adopting Local CEQA Guidelines
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2023
>
2023-051 - Adopting Local CEQA Guidelines
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 5:13:35 PM
Creation date
8/9/2023 5:11:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2023-051
Item #
22
Date
8/1/2023
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Guidelines for Implementing the <br />California Enviromnental Quality Act (2023) ACTIVITIES EXEMPT FROM CEOA <br />3.25 LINEAR BROADBAND DEPLOYMENT IN A RIGHT-OF-WAY. <br />(a) CEQA does not apply to a project that consists of linear broadband deployment in <br />a right-of-way if the project meets all of the following conditions: <br />(1) The project is located in an area identified by the Public Utilities <br />Commission as a component of the statewide open -access middle -mile <br />broadband network pursuant to Section 11549.54 of the Government Code. <br />(2) The project is constructed along, or within 30 feet of, the right-of-way of <br />any public road or highway. <br />(3) The project is either deployed underground where the surface area is <br />restored to a condition existing before the project or placed aerially along <br />an existing utility pole right-of-way. <br />(4) The project incorporates, as a condition of project approval, measures <br />developed by the Public Utilities Commission or the Department of <br />Transportation to address potential environmental impacts. At a minimum, <br />the project shall be required to include monitors during construction <br />activities and measures to avoid or address impacts to cultural and <br />biological resources. <br />(5) The project applicant agrees to comply with all conditions otherwise <br />authorized by law, imposed by the planning department of a city or county <br />as part of a local agency permit process, that are required to mitigate <br />potential impacts of the proposed project, and to comply with the Keene- <br />Nejedly California Wetlands Preservation Act (Chapter 7 (commencing <br />with Section 58 10) of Division 5), the California Endangered Species Act <br />(Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and <br />Game Code), as applicable, other applicable state laws, and all applicable <br />federal laws. <br />(b) If a project meets all of the requirements of subdivision (a), the project applicant <br />shall do all of the following: <br />(1) Notify, in writing, any affected public agency, including, but not limited to, <br />any public agency having permit, land use, environmental, public health <br />protection, or emergency response authority, of the exemption of the project <br />pursuant to this section. <br />(2) File a Notice of Exemption. <br />(3) In the case of private rights -of -way over private property, receive from the <br />underlying property owner permission for access to the property. <br />2023 City of Santa Ana Local Guidelines 3-24 ®Best Best & Krieger LLP <br />
The URL can be used to link to this page
Your browser does not support the video tag.