My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Construction Engineering Services for San Lorenzo Lift Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 25 - Construction Engineering Services for San Lorenzo Lift Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 5:04:33 PM
Creation date
8/10/2023 11:29:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25
Date
5/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUTIER <br />coml,"110" M4,"Mets. cenralld,q Cnow"m <br />Casey Harris <br />Principal -In. -Charge / Senior Schedulerl Claims <br />Station Project. Phase 2 consisted of the constructor of a new 10,000 SF storm <br />water pump station that uses four conventional vertical turbine pumps Installed in <br />a circular wet well. The pump station also consists of new mechanical, electrical, <br />and control systems. An intake pipe was Installed on the slope of the <br />embankment, connecting the new pumps to the Intake Invert. <br />Senior Scheduller, Chino 11 Desaller Concentrate Reduction Facility; <br />Jurupa Valley, CA; Chino Basin Desalter Authority (Completion: 2016— <br />Value: $46.6 mililon)—Senior Scheduler for the CRF groundwater treatment <br />facility. Both !on exchange (IX) and RO treatment trains are used to treat <br />brackish groundwater from eight wells that also have elevated nitrate <br />concentrations. The project scope included construction of new softening, <br />clarification, filtration, and secondary RO (SRO) treatment and solids <br />dewatering and storage; Installation of a new decarbonator; installation of a <br />new transfer pump with motor with associated VFD and motor controls and <br />discharge piping and valves', installation of new cartridge filters; modification <br />of the existing sulfuric acid chemical system; modification of the existing <br />threshold Inhibitor chemical system; and site modifications, Including fencing <br />and gates, yard piping, and storm drain replacement. <br />Senior Scheduler, Carlsbad 50 MGD Seawater Reverse Osmosis <br />Desalination Plant and 10-Mile Conveyance Pipeline; Carlsbad, CA; <br />Poseidon Water (Completion: 1212015; Value: $697 million) —Mr. Harris <br />provided scheduling services for the new construction of a 50 MGD seawater <br />reverse osmosis deselination plant at the EncIna Power Station located in <br />Carlsbad, CA. The scope also included the construction of a 2.5 million gallon <br />product water storage tank; product pump station; and conveyance pipeline to <br />daliver the drinking water produced by the Project to water utilities and <br />municipalities in San Diego County. The 10-mile. 54-inch diameter pipeline was <br />constructed under Interstate 5 Highway and a railroad using a jack and bore <br />tunnel method, Butier staff coordinated closely with the City of Carlsbad, <br />SDCWA, SDG&E, Poseidon and the Coastal Commission during the <br />construction of the tunnel option across Macario Canyon. The pipeline <br />alignment includes over 6,000 feet of tunnels performed by four dIfferent <br />tunneling subcontractors. One of the tunnels is over 1,700 linear feet, 30 feet <br />below sea level, and required a vertical shaft over 80 feet In height, <br />Senior Scheduller/Risk Analysis, Groundwater Reliability Improvement <br />Program (GRIP) Advanced Water Treatment Facility Project, Water <br />Replenishment District of Southern California (Value: $100 million) —Mr. <br />Harris is providing scheduling and risk analysis services as a part of GHD's <br />Owner's Agent/Owner's Engineer team for the GRIP Advianced Water <br />Treatment Facility Project. As a part of the GRIP Program, an advmnced <br />water treatment facility is being constructed to purify 10,000 acre feet (3.25 <br />billion gallons) of tertiary treated (recycled) water annually, The GRIP AWTF <br />is being built on a 5.2 acre property in the City of Pico Rivera, adjacent to the <br />San Gabriel River. The GRIP AWTF will include the following treatment <br />processes: autornatic strainer; microfiltration (MF) and reverse osmosis (RO) <br />followed by Ultraviolet advanc9d oxidation (UVAO),, cartridge fitrntion: <br />decarbonation; and pH adjustment/corrosivity stabilization. <br />
The URL can be used to link to this page
Your browser does not support the video tag.