BUTIER <br />Bfyan Wilson <br />Contract Administrator <br />the new sedimentation basis and the Water Conservation District Canal. The <br />new sedimentation basin will be 200-foot wide and 600-foot long and <br />approximately 10 feet deep, The new pipeline will consist orf approximately <br />1,900 linear feet of 96-Inch diameter CMLC welded steel pipe and 1,300 <br />linear feet of 78-inch diameter CMLC welded steel pipe connecting the new <br />sedimentation basin and the existing 78-inch diameter SBVMWD Foothill <br />Pipeline. <br />Field Engineer/Document Control Specialist, Vista Verde Reservoir <br />Replacement Project —Phase 11; Vista, CA4 City of Escondido <br />(Completion: 2018, Value $9.5 million) —Mr. Wilson Is providing field <br />engineedng and document control servilces, for the replacement of the Vista <br />Verde Reservoir, The existing 750,000-gallon steel reservoir, which suffered <br />from internal corrosion, is being replaced with two 1 million -gallon Type I pre- <br />stressed concrete reservoirs that will be partially buried. The extra capacity <br />for water storage will allow additional development in ths area. The scope of <br />work also includes now interconnecting piping, valve structure, grading, <br />paving, site improvements, landscaping, eleclNcal, instrumentation, and <br />Incidentals for a complete and usable facility. The pipeline portion of the <br />project will extend from the existing pump station along Vista Verde Way, up <br />to the Vista Verde Way cul-de-sac (approximately 6,000 Linear Feet), It <br />includes inlet, outlet and drain line up the hill to the vault structure. <br />Field Engineer/Document Controls, Wineville Extension Recycled Water <br />Pipelline—Segment A; Inland Empire Utilities Agency (Completion: <br />September 2015; Value: $110,6139,00%—Butiler provided construction <br />management, contract administration, and inspection services for the <br />construction of the Wineville Extension Recycled Water Pipeline, Segment A is <br />located in the Cities of Ontario and Fontana and within the San Bernardino <br />Flood Control District property, It begins along East Airport Drive beside the <br />east side of the Day Creek Channel continuing to Jurupa Avenue, south along <br />Wineville Avenue to Francis Street, cast along Francis Street and Marlay <br />Avenue just east of Mulberry Avenue. The construdon consisted of the <br />following: 5,464-LF of 24-inch pipe; 13,500-LF of 313-inch pipe; isolating valves; <br />alr release and vacuum valve assemblies; and blow -off assemblies, Mr. Wilson <br />managed all financial aspects of project construction, Includlng payment <br />application review and processing, change order drafting and approval <br />recommendation construction cost estimating, and overall project budget <br />implementation and tracking. Additionally, Mr. Wilson conducted weekly <br />project meetings, reviewed and processed submittals and RF1s, performed <br />field inspections, and coordinated the resolution of construction and contractual <br />issues. <br />