Laserfiche WebLink
(9) <br />Safety <br />El <br />0 <br />0 <br />City of Sainta Ann, Public Works Agency <br />Construction EngInearing, Services for the <br />San LOrenzo Sewage Lift Stat0n, Rr-P No. fB-049 <br />Attend Contractors weekly safety <br />meeting. Follow and respect <br />Contractor's safety program. <br />Observe for testIng of the quality <br />of air in confined spaces and the <br />provision of a fresh air source. <br />inspect HVAC duct connections, <br />pipe joints, door/hatch seals, <br />penetration seals and equipment <br />seals for tightness and longevity. <br />Ensure HVAC system is installed <br />where the fresh air scource Is <br />unobstructed and unadulterated. <br />inspect to see that all electrical <br />equipment is properly grounded, <br />all switches are the non -spark type <br />and hazardous areas are <br />equipped with explosion proof <br />fixtures, switches, b0X06r outlets - <br />Verify all light sources are installed <br />in a location to provide required <br />lumens for operation personnel. <br />Ei Illness and injury free <br />construction site. <br />0 Maintain a safe working <br />environment In confined space <br />Ei Prevent leakage of odors and <br />explosive gasses. Provide for a <br />hazard free environment. <br />F,J Provide a safe environment for <br />operation and maintenance of the <br />pump station. <br />C1 Facility Is provided with <br />unobstructed lighting for safety <br />and ease of operation and <br />maintenance. <br />Environmentai Impacts <br />C1 Enforce hours of work, noise <br />D <br />Minimize environmental impacts <br />levels, and clean work areas. <br />to the local community. <br />0 Require whisper quiet equipment <br />0 <br />Minimize community complaints <br />for 24-hour dewatering operations <br />and possible complications from <br />and emergency numbers for <br />spills or interruption of dewatering <br />Contractor to address <br />operation. <br />abnormalifies. <br />Structural Failures <br />0 Inspect all structural components <br />Ll <br />Prevent minor structural failures <br />such as concrete, pump base <br />that can cause pumps and other <br />plates and other equipment <br />equipment to run inefriclently <br />supports for level and plumb. <br />causing noise vibration and wear <br />Drive & Pump Shaft <br />0 Require proper alignment using <br />[I <br />Will provide full warranty <br />millwirfght(s) for drive and pump <br />performance, <br />shaft alignment. <br />0 Provide a pump Installation within' <br />the manufacturer's requirement, <br />Longevity of Materials <br />0 Insist the Contractor follow the <br />El <br />Increase longevity of the Pump <br />requirement for corrosion resistant <br />Station and pipeline, <br />materials during construction. <br />Compliance <br />0 Enforce Beat Management <br />n <br />Maintain compliance with all <br />Practices (BMP) for site drainage <br />regulatory agencies. <br />and eliminate runoff. <br />Traffic Control <br />D Monitor and enforce traffic control <br />[I <br />Maintain maximum traffic flow <br />plans for Sergerstrom Avenue, <br />and workeessafety, <br />Pump Station and Pipeline <br />r3 Check Pump Station and Pipeline <br />Ei <br />Provide working hydraulic profile <br />Alignment <br />alignment and depth during <br />as designed for properly <br />construction, <br />functioning facilities. <br />WU--TfUR <br />C. UNDKIIIIIISTANDING 00 NEED <br />