My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As part of a five year On -Call Services with the City of Santa Ana Water <br />Resource Department. Huitt-Zollars is providing Plans, Specifications <br />and Estimates (PS&E) for several projects in the City of Santa Ana. <br />The Sanitary Sewer Septic to Gravity Conversion Project proposes <br />to construct 8" sewer in a neighborhood near 17th Avenue and Tustin <br />Avenue. Huitt-Zollars in providing CEQA documentation and PS&E <br />for over 2500 linear feet of proposed 8" sewer, service laterals, and <br />manholes. <br />2. Lacy Neighborhood Water Replacement Project proposes to replace <br />over 15,000 linear feet of water line and services. The project is part of <br />a citywide program that proposes to replace and increase capacity of <br />over 30,000 If of water line per year. Huitt-Zollars is preparing PS&E <br />that include topography and temporary high water lines. <br />3. French Park Water Replacement Project proposes to replace over <br />15,000 linear feet of water line and services. The project is part of a <br />citywide program that proposes to replace and increase capacity of <br />over 30,000 If of water line per year. Huitt-Zollars is preparing PS&E <br />that include topography and temporary high water lines. <br />RELEVANT DESIGN <br />COMPONENTS: <br />• PS&E <br />• Paving <br />• Domestic Water Improvements <br />• Sewer Improvements <br />• Environmental <br />CLIENT CONTACT: <br />City of Santa Ana <br />Armando Fernandez <br />Senior Civil Engineer <br />Public Works I Water Resources <br />afernandez@santa-ana.org <br />20 Civic Center Plaza, M-35 <br />Santa Ana, CA 92802 <br />714.647.3316 <br />Huitt-Zollars prepared the design of approximately 6,000 of 12" HDPE highline for recycled water to assist the <br />Water district in the transportation of recycled water through the Santa Margarita Water District. Huiit-Zollars also <br />assisted the Santa Margarita Water district in the design and construction of a booster pump station to boost the <br />pressure of the recycled water line through multiple pressure zones. <br />Additionally, Huitt-Zollars worked with Santa Margarita Water District to prepare multiple details to switch pipe <br />materials and underground the highline into a casing and create a crossing of a secondary arterial highway. The <br />design was completed to allow for the maintenance of the pipe without disrupting traffic on the highway. <br />RELEVANT DESIGN COMPONENTS: <br />Survey <br />Engineering Estimates <br />Water Improvements <br />CLIENT CONTACT: <br />Santa Margarita Water District <br />. Jamie Aguilar <br />jaimea@smwd.com <br />26111 Antonio Parkway <br />Rancho Santa Margarita, CA 92688 <br />949.459.6400 <br />City of Santa Ana Civil Engineering Services: RFP 23-030 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.