My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSALFOR <br />RFP NO.: 23-030 <br />Cole St, 5th St, Florence Ave, Samoline & Melva St <br />1951 Cohort Pipeline Replacement <br />La Palma Ave and Tustin Ave Water Main <br />Replacement at Railway Crossing <br />Water Main Replacement (3 projects) <br />Water Main Replacement (Annual) <br />La Mirada Recycled Water Pipeline <br />Katella Ave. Water Main Replacement <br />Water Main Replacement (5 projects) <br />Phase IIB Package 3 RW <br />Recycled Water Expansion <br />Newport Blvd. Water Main Replacement <br />Peters Canyon Channel Reuse Pipeline <br />Crown Valley Force Main Replacement <br />Regional Lift Station Force Main Replacement <br />Gisler-Redhill <br />SARI and Yorba Linda Spur <br />Orange/Del Amo/15th Street <br />Sewer Improvement Project <br />Westminster Avenue & McFadden Sewer <br />Broadway Phase 3 Relining <br />Westminster Ave. and Beach Blvd. Siphon <br />rjw'---_a7.V_%E11L_.-- ---- <br />SA-7 Relocation <br />Carlsbad Conveyance FCF <br />SA-4 and SA-5 <br />Relocation of Zone 1 FCF <br />Kraemer Basin Valve Vault <br />Sand Canyon PRS <br />7,000 <br />22,100 <br />® COMPLETEDESIGN <br />12" —Oct 2022 <br />8"-12" 2021-Current <br />6"-16" Current <br />600 <br />12"-36" <br />2021 <br />24,700 <br />8"-12" <br />2020 - 2021 <br />150,000 <br />8" <br />2002 - 2019 <br />28,700 <br />4"-20" <br />2018 <br />7,000 <br />12"-16" <br />2017 <br />50,000 <br />8"-12' <br />2007 - 2017 <br />20,000 <br />4"-12" <br />2007 - 2017 <br />127,700 <br />4"-24" <br />2016 <br />5,300 <br />8"-24" <br />2016 <br />17,000 <br />10"-16" <br />2016 <br />9,400 <br />12" <br />Oct 2022 <br />16,000 <br />24" <br />2020 <br />3,600 <br />21"-33" <br />2015 <br />25,500 <br />15" & 54" <br />2013 <br />5,200 <br />8"-15" <br />2013 <br />3,700 <br />10" & 12" <br />2013 <br />4,900 <br />12"-15" <br />2013 <br />3,000 <br />14" & 18" <br />2009 <br />3,000 <br />8" & 15" <br />2009 <br />2021 <br />2016 <br />2016 <br />2012 <br />2012 <br />2009 <br />• • . Linda Water District Timber Ridge Booster Pump Station Replacement 2021 <br />Irvine Ranch Water District Zone 8 to 9 Booster Pump Station 2021 <br />City of Elizabeth Booster Pump Station 2016 <br />Irvine Ranch Water District Peters Canyon Channel Revise Pump Facilities 2016 <br />City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.