My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On -Call Engineering Services <br />CLIENT REFEREN SERVICES PROVIDED <br />Irvine Ranch Water District Richard Mori, PE <br />15600 Sand Canyon Avenue Irvine, CA 949/453-5571 <br />92618 mori@irwd.com <br />Orange County Water District <br />18700 Ward Street, Fountain Valley, <br />CA 92708 <br />Moulton Niguel Water District <br />27500 La Paz Road <br />Laguna Niguel, CA 92677 <br />Mike Markus, PE <br />714/378-3305 <br />Matt Collings, PE <br />949/425-3552 <br />mcolling@mnwd.com <br />West Basin Municipal Water District Wendell Johnson, PE <br />17140 S. Avalon Blvd., Suite 210 310/217-2411 <br />Carson, CA 90746 wendellj@westbasin.org <br />8 Pipelines; 6 Pump Stations; 12 <br />Well Equipping; 1 Reservoir, and 4 <br />Membrane Treatment Projects <br />6 Pipelines; 1 Vault Modification; <br />1 Pump Station; and 1 Well Injection <br />Project <br />On -Call Services; 8 pipelines; 4 Meter <br />Projects; 6 Pump Station/1 Lift Station <br />Upgrades; 4 Studies; and 2 Reports <br />As -Needed Engineering; On -Call <br />Customer Development; 6 Pipelines; <br />6 Studies; 1 Pump Station; and 4 <br />Pressure Reducing Valves/Chemicals <br />El Toro Water District <br />Dennis Cafferty, PE <br />949/837-7050dcafferty@etwd <br />Recycled Water Distribution System <br />24251 Los Alisos Blvd. <br />.com <br />Expansion; and Oso Lift Station <br />Lake Forest, CA 92630 <br />Improvements <br />On -Call Services; 2 Well Projects; 4 <br />Mesa Water District <br />Andrew Wiesner, PE <br />Pipeline Projects; Valve Replacements; <br />1965 Placentia Avenue <br />949/207-5458 <br />Standard Upgrades; and 4 Water/ <br />Costa Mesa, CA 92627 <br />andreww@mesawater.org <br />Wastewater Projects <br />City of Los Angeles, Bureau of <br />Engineering <br />1149 S. Broadway, Suite 630 <br />Los Angeles, CA 90015 <br />Pacific Gas & Electric Company <br />77 Beale Street <br />San Francisco, CA 94177 <br />Bryan Powell, PE <br />213/485-5908 <br />bryan.powell@lacity.org <br />Christopher Chu, PLS <br />415/265-4273 <br />christopher.chu@pge.com <br />On -Call Engineering Design Services <br />On -Call Civil Engineering and Land <br />Surveying Services <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.