My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On -Call Engineering Services <br />DOWNTOWN LOS ANGELES (DTLA) ARTS DISTRICT PEDESTRIAN & CYCLIST SAFETY <br />ACTIVE TRANSPORTATION PROJECT (ATP) 3, Los Angeles, CA <br />Tetra Tech provided survey and civil engineering design <br />services for the DTLAArts District Pedestrian and Cyclist <br />Safety Active Transportation Project (ATP) 3. The project <br />area was characterized by a complex street system of very <br />long blocks with few safe crossing locations, complicated <br />intersections, and very limited bike facilities that create <br />mobility challenges for residents, workers and visitors to <br />the district. Many of the streets lack sidewalks, or have very <br />narrow sidewalks, since most streets were built to handle <br />large freight trucks making deliveries and pick-ups at area <br />factories and warehouses where long loading docks and <br />wide driveways take the place of sidewalks for pedestrians. <br />The project design provides pedestrian and cyclist <br />improvements including new cycle tracks, bike lanes, bike routes, new and widened sidewalks with curb <br />extensions, new traffic -controlled intersections, a new shared street connecting to the new Sixth Street Viaduct Arts <br />Plaza, as well as green street elements. <br />In order to accommodate the project's short design timeline, Tetra Tech surveyors deployed immediately and <br />performed an UAV/UAS survey of the entire project area. This allowed a preliminary base file drawing to be created <br />to facilitate the pre -design report phase. As the design of the project evolved Tetra Tech's surveyors and designers <br />worked on a plan to only survey the necessary areas of the project, and only to the detail needed. Many portions <br />of the project needed only striping improvements for which the aerial acquired data was sufficient. Others required <br />striping and lighting. For those surveyors used GPS to locate and ID surface evidence of utilities. For areas of <br />ADA access and critical drainage, survey crews utilize robotic total station and terrestrial LiDAR to capture design <br />accurate grades. Data from the various forms of acquisition was combined into a seamless looking base file <br />drawing to support the final engineering design. <br />SKID ROW NEIGHBORHOOD TOPOGRAPHIC SURVEYS AND CONSTRUCTION STAKING, <br />Los Angeles, CA <br />Tetra Tech provided surveying and construction staking <br />services for mobility improvements in the Skid Row <br />Neighborhood, Los Angeles. Tetra Tech surveyed <br />13 intersections in coordination with the Bureaus of <br />Engineering and Sanitation, as well as the Los Angeles <br />Police Department and subcontractors. Survey logistics <br />were complex while as many as three Tetra Tech crews <br />followed Bureau of Sanitation personnel and police <br />officers as they facilitated the temporary closure of <br />locations used by homeless residents. Crews focused <br />on conducting accurate and complete surveys with <br />special attention to crew and public safety and sensitivity <br />to homeless residents in the vicinity. Deliverables were created to meet the City's standards and guidelines <br />and for direct use and import by the City's design staff. <br />M <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.