Laserfiche WebLink
PHONE <br />FAX:F.O.B. <br />email: acvek@santa-ana.org FREIGHT <br />SHIP TO: <br />Maintenance <br />Kit/Info ?TERMS (Subject To Credit Approval By LSI) <br />BILL TO:SHIPPING TIME 30 Weeks <br />We are pleased to submit this proposal to supply the following items: <br />QTY ITEM NO.DESCRIPTION <br />3 CUST20-29 <br />1 MB051018-7 <br />1 CUST010720-13 <br />$985,320 <br />($78,826) <br />1 $405,328 <br />1 $2,132 <br />1 $258,060 <br />1 $84,992 <br />1 $38,429 <br />$170,661 <br />$25,800 <br />Total Weight <br />ORDER ONLY UPON APPROVAL BY LANDSCAPE STRUCTURES, INC. CUSTOMER SUBTOTAL MATERIAL $1,311,822 <br />RECEIPT OF AN ORDER ACKNOWLEDGEMENT CONSTITUTES SUCH APPROVAL. <br />Landscape Architect, Concrete, Play & Shade <br />INSTALLATION $580,074 <br />ACCEPTED BY CUSTOMER DATE <br />FREIGHT $66,530 <br />PRINT NAME <br />SALES TAX $83,850.70 <br />PROPOSED BY LSI REPRESENTATIVE DATE <br />TOTAL 2,042,276.70$ <br />PRINT NAME <br />Installation of Landscape Structures Playground <br />Drawing #1156784-01-05 <br />Installation of Skyways 10 post tension shades Footings <br />based on a 3'x10' hole w/ rebar cages <br />CUSTOM PARK & PLAYGROUND PACKAGE <br />plyStandard Terms and Conditions for Installation Ap <br />Installation of 15,321 Square Feet of conrete subbase. The <br />subcontractor plans on using some of the existing road base <br />and sand to build up area under the concrete. <br />Installation of 3 Skyways Flower Shades Footings <br />based on 2'x6' hole w/ rebar cages <br />SKYWAYS CUSTOM SHADE SYSTEM PACKAGE <br />SKYWAYS CUSTOM SHADE SYSTEM PACKAGE <br />(REFERENCE DRAWING #1156784-01-05) <br />8% DISCOUNT <br />Provide Security fencing for parking lot staging area TLP <br />Plans on using existing fencing to secure playground area <br />SIGNATURE BELOW ACCEPTING THIS PROPOSAL WILL CONSTITUTE A PURCHASE <br />EXTENDED AMT <br />City of Santa Ana <br />714-310-0638 <br />City of Santa Ana <br />Arne Cvek <br />Thorton Barrier Free Park <br />15,321 SQ. FT. Surface America Poured in place rubber <br />surfacing 3.5 inch thick system (Thickness subject to nominal <br />variation) with top surface in 100% color to include freight and <br />Aliphatic binder. Includes a 2 color graphics of blue and green <br />as shown in drawing #1156784-01-05 dated 1-30-2023. No <br />slopes or mounds. <br />Coast Recreation, will provide grading plan, elevation plan, <br />site plan, and drainage plan. <br />Project Name: <br />Destination -- Thorton Barrier Free Park <br />2-3 Weeks ARO <br />Pricing Good for 60 days from Date of Proposal <br />Net 30 days upon credit approv., deposit may be required <br />PROPOSAL <br />Sourcewell Contract No. 010521 -LSI <br />Prepaid Collect <br />ALL PURCHASE ORDERS, CONTRACTS, AND <br />CHECKS TO BE MADE OUT TO: <br />LANDSCAPE STRUCTURES, INC. <br />601 7TH STREET SOUTH <br />DELANO, MN 55328 U.S.A. <br />763-972-3391 800-328-0035 <br />Fax: 763-972-3185Customer Information <br />CONTACT: Arne Cvek 4-13-23 <br />PREVAILING WAGE <br />EXHIBIT 3