Laserfiche WebLink
Project Name and Location Client Project Status Services Provided Description of Project (Challenges and Solutions) Reference Task Order Team Members <br />Stantec Consulting Services Inc. <br />Rancho Los Amigos National <br />Los Angeles <br />Ongoing <br />Topo mapping of utilities and tunnels <br />Challenges: confined space for surveying, safety <br />Yugal Lall <br />Greg Seboum, Ray Mansur, Tessie <br />Rehabilitation Center Utility and Tunnel <br />County <br />Solutions: adhered to all safe work practices, clear <br />Senior Capital Projects Manager, <br />Barriga, Joseph Nelson, Tim Eich, Jason <br />Survey <br />Department of <br />communication with Los Angeles County Department of Public <br />Project Management Division II <br />Shockley <br />Public Works, <br />Works <br />(626) 476-2837 <br />Project <br />ylall@dpw.lacounty.gov <br />Management <br />Division <br />South Whittier Outfall <br />Sanitation Districts <br />Completed 12/2017 <br />Aerial control, topo survey and mapping, <br />Challenges: schedule was critical <br />Michael Tatalovich, Section Head, <br />Greg Seboum, Ray Mansur, Tessie <br />of Los Angeles <br />manhole surveys, and right-of-way <br />Solutions: well -organized scope with closely managed staff <br />Sewer Design Section <br />Barriga, Joseph Nelson, Tim Eich, Jason <br />County <br />mapping <br />delivered the project within the critical schedule <br />(562) 9084288 <br />Shockley <br />mtatalovich@lacsd.org <br />Robert Gardner, Supervising Designer, <br />Sewer Design Section <br />(562) 9084288 ext 1615 <br />rgardner@lacsd.org <br />Green Lane Pump Station <br />Sanitation Districts Completed 812017 <br />Aerial control, topo survey and mapping, <br />Challenges: schedule was critical <br />Michael Tatalovich, Section Head, <br />Greg Sebourn, Ray Mansur, Tessie <br />of Los Angeles <br />manhole surveys, and right-of-way <br />Solutions: well organized scope with closely managed staff <br />Sewer Design Section <br />Barriga, Joseph Nelson, Tim Eich, Jason <br />County <br />mapping <br />delivered the project within the critical schedule <br />(562) 9084288 <br />Shockley <br />mtatalovich@lacsd.org <br />Robert Gardner, Supervising Designer, <br />Sewer Design Section <br />(562) 9084288 ext 1615 <br />rgardner@lacsd.org <br />Cabrinha Hearn & Associates Experience <br />Westside Extension, Segment 1 <br />WEST JVIMETRO 10/2013 - Ongoing <br />Horizontal and vertical project control <br />Challenges: heavy rail, 9-mile subway extension project under <br />Joe DeMello <br />Camden Cabrinha, Jamie Begchume, <br />Los Angeles, CA <br />verification and densification survey; <br />construction; tunneling under heavily populated areas <br />LA Metro Director, <br />Edward Uribe, Rene Rodriguez, Bernard <br />exploratory shaft site monitoring; as -built <br />Solutions: as -built mapping provided to accommodate utilities <br />Construction Management Westside <br />Xu <br />surveys and mapping; advanced utility <br />relocation often with less than an 8-hour request window to <br />Extension <br />relocation layout and construction <br />enable the design/build team to accurately locate utilities for <br />(323) 900-2112 <br />staking; utility plan verifications; <br />station box/decking design and placement <br />demelloj@metro.net <br />monument preservation/restoration, <br />topographic design/as-built mapping; <br />and western station track alignment and <br />platform as -built <br />GPSi Experience <br />LADWP 230 KV Scattergood Plan <br />Los Angeles <br />212016 - 312016 <br />As subconsultant, provided: <br />Challenges: LAX is one of the busiest airports in the world with <br />Tessie Barriga PE <br />Ramon Ramos, Maria Alice Ramos, <br />and Profile <br />Department of <br />photogrammetric mapping 1 "=40', 1-foot <br />difficult low altitude Flying directly in the AP take off zone <br />Stantec <br />Paul Hamilton -Rivers <br />Los Angeles, CA <br />Water and Power <br />contours, orthos <br />Solution: aerial survey and photogrammetric mapping 1"=40' wl <br />(949) 923-6946 <br />(LADWP)IStantec <br />1' CI,11 linear miles; flight coordination with air traffic control <br />tessie.barriga@stantec.com <br />Sediment Augmentation Project <br />Fish & Wildlife <br />412016 - 512016 <br />As prime, provided: photogrammetric <br />Challenge: revitalization and preservation of the Seal Beach <br />Kirk Gilligan, Refuge Manager <br />Ramon Ramos, Maria Alice Ramos, <br />Seal Beach CA <br />Services <br />mapping 1"=20', 0.5-foott contours, <br />wetlands requiring coordination with multiple Federal agencies, <br />Fish & Wildlife Services <br />Paul Hamilton -Rivers <br />4-band orthos <br />such as USGS and Fish & Wildlife Services <br />(909) 9824601 <br />Solution: aerial survey and photogrammetric mapping 1"=20' wl <br />kirk—gilligan@fws.gov <br />0.5' CI, collecting point data using SGM methods whilst still <br />achieving a very high accuracy set of mapping deliverables along <br />with four -band digital orthophotography <br />8 of 10 Stantec <br />