Project Name and Location Client Project Status Services Provided Description of Project (Challenges and Solutions) Reference Task Order Team Members
<br />Stantec Consulting Services Inc.
<br />Rancho Los Amigos National
<br />Los Angeles
<br />Ongoing
<br />Topo mapping of utilities and tunnels
<br />Challenges: confined space for surveying, safety
<br />Yugal Lall
<br />Greg Seboum, Ray Mansur, Tessie
<br />Rehabilitation Center Utility and Tunnel
<br />County
<br />Solutions: adhered to all safe work practices, clear
<br />Senior Capital Projects Manager,
<br />Barriga, Joseph Nelson, Tim Eich, Jason
<br />Survey
<br />Department of
<br />communication with Los Angeles County Department of Public
<br />Project Management Division II
<br />Shockley
<br />Public Works,
<br />Works
<br />(626) 476-2837
<br />Project
<br />ylall@dpw.lacounty.gov
<br />Management
<br />Division
<br />South Whittier Outfall
<br />Sanitation Districts
<br />Completed 12/2017
<br />Aerial control, topo survey and mapping,
<br />Challenges: schedule was critical
<br />Michael Tatalovich, Section Head,
<br />Greg Seboum, Ray Mansur, Tessie
<br />of Los Angeles
<br />manhole surveys, and right-of-way
<br />Solutions: well -organized scope with closely managed staff
<br />Sewer Design Section
<br />Barriga, Joseph Nelson, Tim Eich, Jason
<br />County
<br />mapping
<br />delivered the project within the critical schedule
<br />(562) 9084288
<br />Shockley
<br />mtatalovich@lacsd.org
<br />Robert Gardner, Supervising Designer,
<br />Sewer Design Section
<br />(562) 9084288 ext 1615
<br />rgardner@lacsd.org
<br />Green Lane Pump Station
<br />Sanitation Districts Completed 812017
<br />Aerial control, topo survey and mapping,
<br />Challenges: schedule was critical
<br />Michael Tatalovich, Section Head,
<br />Greg Sebourn, Ray Mansur, Tessie
<br />of Los Angeles
<br />manhole surveys, and right-of-way
<br />Solutions: well organized scope with closely managed staff
<br />Sewer Design Section
<br />Barriga, Joseph Nelson, Tim Eich, Jason
<br />County
<br />mapping
<br />delivered the project within the critical schedule
<br />(562) 9084288
<br />Shockley
<br />mtatalovich@lacsd.org
<br />Robert Gardner, Supervising Designer,
<br />Sewer Design Section
<br />(562) 9084288 ext 1615
<br />rgardner@lacsd.org
<br />Cabrinha Hearn & Associates Experience
<br />Westside Extension, Segment 1
<br />WEST JVIMETRO 10/2013 - Ongoing
<br />Horizontal and vertical project control
<br />Challenges: heavy rail, 9-mile subway extension project under
<br />Joe DeMello
<br />Camden Cabrinha, Jamie Begchume,
<br />Los Angeles, CA
<br />verification and densification survey;
<br />construction; tunneling under heavily populated areas
<br />LA Metro Director,
<br />Edward Uribe, Rene Rodriguez, Bernard
<br />exploratory shaft site monitoring; as -built
<br />Solutions: as -built mapping provided to accommodate utilities
<br />Construction Management Westside
<br />Xu
<br />surveys and mapping; advanced utility
<br />relocation often with less than an 8-hour request window to
<br />Extension
<br />relocation layout and construction
<br />enable the design/build team to accurately locate utilities for
<br />(323) 900-2112
<br />staking; utility plan verifications;
<br />station box/decking design and placement
<br />demelloj@metro.net
<br />monument preservation/restoration,
<br />topographic design/as-built mapping;
<br />and western station track alignment and
<br />platform as -built
<br />GPSi Experience
<br />LADWP 230 KV Scattergood Plan
<br />Los Angeles
<br />212016 - 312016
<br />As subconsultant, provided:
<br />Challenges: LAX is one of the busiest airports in the world with
<br />Tessie Barriga PE
<br />Ramon Ramos, Maria Alice Ramos,
<br />and Profile
<br />Department of
<br />photogrammetric mapping 1 "=40', 1-foot
<br />difficult low altitude Flying directly in the AP take off zone
<br />Stantec
<br />Paul Hamilton -Rivers
<br />Los Angeles, CA
<br />Water and Power
<br />contours, orthos
<br />Solution: aerial survey and photogrammetric mapping 1"=40' wl
<br />(949) 923-6946
<br />(LADWP)IStantec
<br />1' CI,11 linear miles; flight coordination with air traffic control
<br />tessie.barriga@stantec.com
<br />Sediment Augmentation Project
<br />Fish & Wildlife
<br />412016 - 512016
<br />As prime, provided: photogrammetric
<br />Challenge: revitalization and preservation of the Seal Beach
<br />Kirk Gilligan, Refuge Manager
<br />Ramon Ramos, Maria Alice Ramos,
<br />Seal Beach CA
<br />Services
<br />mapping 1"=20', 0.5-foott contours,
<br />wetlands requiring coordination with multiple Federal agencies,
<br />Fish & Wildlife Services
<br />Paul Hamilton -Rivers
<br />4-band orthos
<br />such as USGS and Fish & Wildlife Services
<br />(909) 9824601
<br />Solution: aerial survey and photogrammetric mapping 1"=20' wl
<br />kirk—gilligan@fws.gov
<br />0.5' CI, collecting point data using SGM methods whilst still
<br />achieving a very high accuracy set of mapping deliverables along
<br />with four -band digital orthophotography
<br />8 of 10 Stantec