Laserfiche WebLink
We R Builders, Inc. <br />3746 Foothill Blvd, #304, Glendale, CA 91214 <br />714.423.3844 1 Estimating(a)WRBConstruction.com <br />CA License #1055746 1 DIR #1000884610 <br />H-1-M L: JULT 1, 2022 IFIRVUUH JUNE 30, 2U23 <br />PROJECT MANAGEMENT - <br />CLASS CODE <br />STRAIGHT -TIME <br />OVER -TIME <br />DOUBLE-TIME <br />Project Administrator <br />PADM <br />$71.02 <br />$91.33 <br />$1 1 1.63 <br />Project Engineer 1 <br />PEG1 <br />$77.59 <br />$100.77 <br />$1 23.95 <br />Project Engineer 2 <br />PEG2 <br />$89.07 <br />$1 17.00 <br />$144.92 <br />Project Engineer 3 <br />PEG3 <br />$97.34 <br />$129.16 <br />$161.00 <br />Superintendent <br />PMSP <br />$154.74 <br />$201.74 <br />$248.74 <br />Assistant Project Manager <br />PMAS <br />$1 27.81 <br />$173.27 <br />$221.47 <br />Project Manager <br />PMPM <br />$144.52 <br />$194.92 <br />$245.32 <br />Senior Project Manager <br />PMSR <br />$202.61 <br />$273.55 <br />$344.48 <br />LABORERS - <br />CLASS CODE <br />STRAIGHT -TIME <br />OVER -TIME <br />DOUBLE-TIME <br />General Foreman <br />LAGF <br />$1 01 .21 <br />$137.79 <br />$174.36 <br />Foreman <br />LAFM <br />$98.68 <br />$130.67 <br />$162.69 <br />Group 5 - Blaster / Drifter <br />LAG5 <br />$95.75 <br />$126.39 <br />$157.03 <br />Group 4 - Pipe Layer, C&S <br />LAG4 <br />$95.23 <br />$125.63 <br />$156.02 <br />Group 3 - Pipeline Backup Man <br />LAG3 <br />$92.96 <br />$1 22.21 <br />$151.47 <br />Group 2 - Chute Man <br />LAG2 <br />$92.15 <br />$1 21.02 <br />$149.89 <br />Group 1 - General <br />LAG <br />$91.35 <br />$1 19.81 <br />$148.26 <br />Apprentice - 6th Period (85%) <br />LAA6 <br />$88.43 <br />$120.40 <br />$152.36 <br />OPERATING ENGINEERS - <br />CLASS CODE <br />STRAIGHT -TIME <br />OVER -TIME <br />DOUBLE-TIME <br />Foreman, Appdx. A <br />OEFM <br />$1 23.98 <br />$161.86 <br />$202.19 <br />Group 8, Appdx. A - Universal <br />OEG8 <br />$120.55 <br />$154.52 <br />$193.61 <br />TEAMSTERS - CLASS CODE STRAIGHT -TIME OVER -TIME DOUBLE-TIME <br />Group 10 - Working Truck Driver TDG 10 $94.20 $1 20.96 $146.89 <br />iw1n01 i iLrtrvw <br />• The rates proposed herein consist of WRB's in-house employee's rates only. <br />• All rates provided herein includes all Markups, and no additional markups should be applied to these rates. <br />• All (if any) third -party Sub-Tiers/Vendors providing services or products for the Contract, shall be compensated for, per the following: <br />Material, subcontractors, subsistence, outside equipment rentals, machinery rentals, tools rentals, costs in fuel for such rentals, permits, <br />inspections, and other related costs or fees will be billed at the total Invoice Amount (costs + sales tax, as applicable) + Markups of 15% <br />for Overhead and Profits. <br />• Overtime Rates: Shift(s) shall be compensated for per union agreement(s). If unscheduled On -Call Emergency Dispatches occur after <br />crew worked their standard 8-hour work shift, Overtime/Double-Time rates may apply at the beginning of the work shift, dependent on <br />Crews total hour worked, and per Union Agreement(s). <br />• Foreman's & Truck Drivers shall be compensated for One additional (+1) workhour (ST, OT, or DT) per work -shift, in addition to the <br />work hours reported for the crew's work shift(s). <br />• Travel Time: Billing time will begin once employees are dispatched, and end upon their return to the company facility. <br />• Subsistence: Lodging & meals for management, superintendents & general foreman will be billed, when deemed adequate, at actual <br />costs, plus mark-up at 15%. <br />• Apprentice rates listed above are for the highest classification prior to journeyman full scale rates. <br />• This document does not include all labor classifications. Additional labor classifications are available upon request(s). Some work areas <br />may be subject to special wage agreements; if applicable, fees will be billed accordingly. <br />• These terms shall extend and apply to the attached equipment rates, as applicable. <br />• Where warranty is deemed adequate for the services provided, the warranty is limited to One -Year after completion of work. <br />• These rates assume there will be no need of Bond Premiums (Bid Bond, Payment Bond and Performance Bond). <br />• Rates scale provided herein will increase at the rate and time determined per the applicable Prevailing Wage Rate in California. <br />06.30.2023 1 OF 1 1 PAGE WRB.T&M.LBR.22-23 <br />PUBLIC WORKS WWW.WERBUILDERS.COM T&M COST-PLUS RATES <br />