My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for On-Call Emergency Asphalt and Concrete Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Item 20 - Agreements for On-Call Emergency Asphalt and Concrete Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 11:14:07 AM
Creation date
8/10/2023 1:50:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/2/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We R Builders, Inc. <br />15 Homestead Drive, Trabuco Canyon, CA 92679 <br />714.874.5275 1 Admin O WRBConstruction.com <br />CA License #1055746 1 DIR #1000884610 <br />Project Reference: On Call Emergency Asphalt & PCC (RFP No. 22-096) <br />In reference to the referenced RFP, enclosed as an attachment is We R Builders, Inc. (WRB) proposal price -list for the bid items <br />related to the Sample Task Order B — Concrete Paving. <br />Due to limited information provided, the following assumptions were made in regards to the scope of work, with considerations made <br />regarding the Contractors responsibilities in the referenced RFP (Note: The information provided below A-F is also being provided to <br />provide the City of Santa Ana clarity of how the proposed pricing was derived; should the City require the pricing broken out <br />differently, WRB will make it a priority to return such revised pricing(s) to the City). <br />A. Certain bid items indicated demo and replacement work; however, other bid items did not indicate the replacement of an <br />existing condition, but only to construct/install the proposed item(s). <br />WRB considered the contractors responsibilities in the RFP, and included the demolition, disposal, hauling/trucking, and/or <br />disposal of the existing condition (similar to its related bid item). <br />B. The scope of work is priced assumed to be in continuous sequence to meet production, vs to be performed at separate <br />stages. <br />C. Unclassified Excavation pricing assumes no hazardous material exist, disposing of such material, and replaced and <br />compacted using SE-30 sand (or similar). <br />D. PCC Curb Ramp assumes approximately Ten (10-each) Curb Ramps in total. <br />E. The scope of work associated to the i) Pull Box (Item #5) and ii) Manhole (Item #6) are assumed to be performed when the <br />scope interferes with other portions of contractors work in this bid. <br />F. Traffic Control assumes WATCH manual will suffice. <br />Please contact Nezar Alsmadi should you have any questions or concerns regarding this Proposal Packet. Thank you for your <br />consideration of We R Builders, and we hope to hear from you soon. <br />Sincerely, <br />b' _ a�• Akrs -,Ltc:li, President <br />Cell: 714.423.3844 1 Email: nalsmadi((7wrbconstruction.com <br />We R Builders, Inc. <br />We R Builders, Inc. <br />R F P N 0. 2 2- 0 9 6 www.WRBConstruction.com 1 OF 1 I PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.