My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Water Supply Assessment for Cabrillo Town Center Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 27 - Water Supply Assessment for Cabrillo Town Center Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 4:32:44 PM
Creation date
8/10/2023 4:31:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
5/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cabrillo Town Center <br />WATER SUPPLY ASSESSMENT FEBRUARY 13, 2023 <br />6 <br />additional information regarding groundwater supply and management will be included in the <br />WSA to satisfy the requirements of SB 1262. <br />2. INTRODUCTION <br />2.1 PROJECT DESCRIPTION <br />The Cabrillo Town Center Project is an approximately 9.0-acre residential and mixed-use <br />commercial project located in the City of Santa Ana. The Project address is bounded by East 4th <br />Street and Cabrillo Park Drive to the south and west, office buildings to the east, and Cabrillo <br />Park to the north. See Figure 1 for a vicinity map of the proposed site location. The existing <br />property is currently occupied by four-3-story office buildings. <br />The proposed project includes the development of a five-story mixed-use building consisting of <br />449 apartment units, approximately 23,300 SF of retail and commercial space, and a garage at <br />the south side of the site, and 58 townhome units at the north side of the site. <br />Parking for the project will be provided within a garage structure for the mixed-use building and <br />street parking and home garages for the townhomes. Amenities of the project include pool, <br />spa, fitness center, lounge, and clubroom. Landscaped open space is provided through common <br />areas and courtyards. See Table 1 below for additional specifications related to the proposed <br />project. <br />Table 1 Project Home Type Details <br />Home Type Unit Count Percentage of Total Unit <br />Count <br />Studio Apartment 23 4.5% <br />1 bedroom Apartment 264 52.1% <br />2 bedroom Apartment 148 29.2% <br />Live/work+2 bedroom Apt 14 2.8% <br />2 bedroom townhome 26 5.1% <br />3 bedroom townhome 20 3.9% <br />4 bedroom townhome 12 2.4% <br />Total 507 100% <br />As mentioned above, the purpose of this WSA is to provide information to confirm that the City <br />of Santa Ana has sufficient water supply to provide for the proposed project in addition to other <br />service area demands now and into the future. This WSA compares the existing water demand <br />of the project site to the proposed water demand of the project and to the City of Santa Ana <br />regional water supplies and demands through 2040.
The URL can be used to link to this page
Your browser does not support the video tag.