Laserfiche WebLink
Cabrillo Town Center <br />WATER SUPPLY ASSESSMENT FEBRUARY 13, 2023 <br />9 <br />As shown in Table 2, the estimated existing water use at the project site is approximately 8,545 <br />gallons per day (gpd) or 9.6 acre-feet per year (AFY). An estimated annual difference between <br />existing water demands and proposed water demands resulting from the proposed project are <br />calculated and shown in Section 2.1.2 below.