Laserfiche WebLink
Local Assistance Procedures Manual <br />EXHIBIT 10-112 <br />Cost Proposal <br />EXHIBIT 10-112 COST PROPOSAL Page 1 0£3 <br />SPECIFIC RATE OF COMPENSATION (USE FOR ON -CALL OR AS -NEEDED CONTRACTS) <br />(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS) <br />Consultant TransMat, Inc. D Prime Consultant �X Subconsultant <br />Project No. TBD Contract No. TBD <br />Participation Amount=lin $950,000.00 <br />❑ 2nd Tier Subconsultant <br />Date 1/27/2023 <br />FRINGE BENEFIT % + GENERAL & ADMINISTRATIVE % = COMBINED ICR% <br />+ SHR 110.00 % <br />Fee 10.00 % <br />BILLING INFORMATION CALCULATION INFORMATION <br />Name/Job Title/Classification <br />Hourly Billing Rates <br />Effective date of hourly rate Actual or Avg <br />% or $ <br />Hourly Range - <br />Straight OT(I.Sx) OT(2x) <br />From To Hourly Rate <br />increase <br />for Classifications Only <br />GENERAL PREVAILING WAGE <br />CRAFT: BUILDING/CONSTRUCTION <br />INSPECTOR <br />AND FIELD <br />Hourly Billing Rates <br />Effective date <br />of hourly rate <br />Engineering Technician (Field) <br />Straight OT(1.5x) OT(2x) <br />From <br />To <br />$ 146.63 $ 204.95 $ 263.28 <br />10/1/2022 <br />9/30/2023 <br />Group 1 - Field Soils and Material Testers <br />$ 151.03 $ 211.10 $ 271.18 <br />10/1/2023 <br />9/30/2024 <br />$ 155.56 $ 217.43 $ 279.31 <br />10/1/2024 <br />9/30/2025 <br />$ 150.74 $ 211.12 $ 271.50 <br />10/1/2022 <br />9/30/2023 <br />Group 2 - Special Inspection / Batch Plant <br />$ 155.26 $ 217.45 $ 279.65 <br />10/1/2023 <br />9/30/2024 <br />$ 159.92 $ 223.98 $ 288.03 <br />10/1/2024 <br />9/30/2025 <br />$ 155.36 $ 218.05 $ 280.74 <br />10/1/2022 <br />9/30/2023 <br />Group 3 - Nondestructive Testing <br />$ 160.02 $ 224.59 $ 289.16 <br />10/1/2023 <br />9/30/2024 <br />$ 164.82 $ 231.33 $ 297.84 <br />10/1/2024 <br />9/30/2025 <br />Engineering Technician (Field) - Special Shift <br />a11 <br />Straight <br />OT(I.5x) <br />OT(2x) <br />From <br />To <br />$ <br />147.78 <br />$ 206.69 <br />$ 265.59 <br />10/1/2022 <br />9/30/2023 <br />Group 1 - Field Soils and Material Testers (Special Shift) <br />$ <br />152.21 <br />$ 212.89 <br />$ 273.56 <br />10/1/2023 <br />9/30/2024 <br />$ <br />156.78 <br />$ 219.28 <br />$ 281.76 <br />10/1/2024 <br />9/30/2025 <br />$ <br />151.89 <br />$ 212.85 <br />$ 273.81 <br />10/1/2022 <br />9/30/2023 <br />Group 2 (Special Shift) <br />$ <br />156.45 <br />$ 219.24 <br />$ 282.02 <br />10/1/2023 <br />9/30/2024 <br />$ <br />161.14 <br />$ 225.81 <br />$ 290.49 <br />10/1/2024 <br />9/30/2025 <br />$ <br />156.51 <br />$ 219.78 <br />$ 283.05 <br />10/1/2022 <br />9/30/2023 <br />Group 3 (Special Shift) <br />$ <br />161.21 <br />$ 226.37 <br />$ 291.54 <br />10/1/2023 <br />9/30/2024 <br />$ <br />166.04 <br />$ 233.16 <br />$ 300.29 <br />10/1/2024 <br />9/30/2025 <br />NOTES: <br />*Subject to Prevailing Wage <br />- Billing rate - actual hourly rate * (1 + ICR) * (1 + Fee). <br />Prevailing Wage DIR Determination: SC-23-63-2-2020-21) <br />3 % annual escalation <br />City of Santa Ana <br />RFQ 20-111 <br />2of3 <br />