My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 19 - Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:43:44 AM
Creation date
8/10/2023 5:12:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Developed preliminary and final design for 6,000 gpm IX system for PFAS treatment at the N-Wells and 1,200 <br />gpm IX system for Perchlorate Treatment at the Q2 Well. <br />• Provided engineering services during construction for IX equipment pre -purchase and for site construction. <br />KJ I Elsinore Valley Municipal Water District I Canyon Lake WTP Phase 1 <br />Improvements I Ongoing <br />Team: David Ferguson, Steve Diamond, Kajori Purkayastha Project Contact: <br />This project consists of designing improvements to an existing surface water treatment Parag Kalaria, PE <br />plant, Canyon Lake Water Treatment Plant (CLWTP), described as the Phase I Water Resources Manager <br />improvements in alignment with the CLWTP Facilities Master Plan (2017). PFOA and (951) 674-3146 <br />PFOS levels in Canyon Lake exceeded the California Notification Levels and PFOA <br />levels exceeded the state Response Level. KJ was retained to perform a feasibility study to <br />evaluate planning level alternatives for the proposed Facilities Master Plan improvements <br />to the treatment plant. The design effort includes new PFAS treatment as recommended in <br />the CLWTP Site Feasibility Study (2020). The project also includes pilot testing for PFAS, <br />bench testing for cyanotoxins, Preliminary Design, Final Design environmental services <br />(CEQA support), public outreach, and bid phase services. <br />The 9-month pilot study looked at GAC, IX, and the dual barrier combination of GAC <br />followed by IX. The dual barrier PFAS treatment system with GAC followed by IX is now <br />proceeding from 60% to 90% design. <br />EEC I City of Anaheim I On -call Engineering Services 12007 - Ongoing <br />Team: Will Shaffer, Jim Kolk, John Shaffer, Brandon Willnecker Project Contact: <br />EEC provides as -needed environmental engineering services across multiple scopes of Keith Linker, PE <br />work. EEC's staff have provided design and consulting services in the following areas: Principal Civil Engineer <br />• Sewer capacity analysis and sewer design manual development I (714) 765-4141 <br />• Lenain pump station retrofit — Civil Engineering, grading, NPDES compliance <br />• Alley sewer upsizing combined with water quality improvements <br />• City trash amendment compliance — BioChar treatment and catch basin screening <br />• Modjeska Park regional stormwater capture — Post construction grant compliance, digital monitoring program, <br />O&M optimization <br />• Citywide stormwater fee generation planning <br />• Regional Stormwater Capture project feasibility planning <br />• Richfield and La Palma stormwater capture and infiltration flood relief project <br />• State College storm drain project — repurpose abandoned sewer line for groundwater recharge and reduce inflow to <br />county drainage facilities <br />• District 27 drainage analysis <br />• Prop 1 and Metropolitan Water District grant funding application support <br />• Comprehensive citywide stormwater pump station evaluation <br />FReferences <br />References have been provided for each relevant project in Section E Relevant Experience above. EEC is happy to provide <br />additional references upon request. <br />EEC Environmental 13 November 17, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.