My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 19 - Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:43:44 AM
Creation date
8/10/2023 5:12:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water/Emerging Contaminants <br />Wastewater/Stormwater <br />Litigation Support <br />Regulatory Compliance <br />Technology/GIS <br />iiuiiurcuZ:, ui Neinnu, niuuuiiig uwuZ:,aiiuZ:, ui iaunLy anu e[11U[ enienL. <br />Jim holds a Bachelor of Science from San Jose State University. He maintains professional certification in Sanitary <br />Sewer Overflow Reporting from the California Water Environment Association and in Pipeline Assessment and <br />Certification from the National Association of Sewer Service Companies. <br />EXPERIENCE <br />Project Manager / Principal -In -Charge, Various Water / Wastewater Projects I City of Santa Ana I Santa Ana, CA <br />• PFAS treatment implementation strategy development and support services. <br />• Water system disinfection testing and analytical services. <br />• Water system de minimis discharge program development and implementation support. <br />• Water conservation program assessment and response support. <br />• WDR and FOG program development implementation services. <br />• Commercial facility plan review and compliance assessment services. <br />• Collection system 0&M program development and implementation. <br />Project Manager / Principal -In -Charge, Sewer Capacity Study I Costa Mesa Sanitation District I Costa Mesa, CA <br />• Performed data analysis to identify sewer capacity limited and vulnerable pipelines across entire sewer district. <br />• Oversight of dry/wet weather flow studies including site selection, meter installation, and data processing. <br />• Oversight of flow model development and integration with asset management GIS with spatial analysis. <br />Project Manager, Pretreatment Program Development and Implementation for Various Municipalities I Nationwide <br />• Manage pretreatment program assessment, development, and implementation of key program elements, including legal <br />authority review/development, industrial waste survey screening and local limits development/implementation. <br />• Prepare program manuals and procedures/guidelines for industrial user inspection, sampling, and enforcement activities. <br />Project Manager / Technical Lead, Sewer Collection System Consulting for Various Municipalities I Nationwide <br />• Routinely hired by municipalities for sewer collection system condition assessment and SSO reduction program <br />development and implementation. <br />• Oversight and perform sewer mainline CCTV inspections for condition assessment and characterization, identification of <br />SSO causes and performance evaluation of mitigation efforts. <br />• Provide expert FOG control consulting services ranging from ordinance and permit development, grease interceptor sizing <br />and installation requirements, inspector and enforcement procedures, and database and GIS management. <br />• Clients include Washington Suburban Sanitary Commission, Boston Water and Sewer, Seattle Public Utilities Commission, <br />Orange County Sanitation District, Irvine Ranch Water District, and the City of Santa Ana. <br />
The URL can be used to link to this page
Your browser does not support the video tag.