My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 19 - Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:43:44 AM
Creation date
8/10/2023 5:12:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROP ALFOR <br />On -Call Engineering Design Services <br />City of Downey I PFAS Study for Five Wells <br />Owner: City of Downey <br />Number of Wells: 5 <br />Capacity: 1,100 GPM to 1600 GPM <br />Status: Study Completed July 2021 <br />Construction Costs: $3.0 million to $5.5 million <br />PFAS Treatment: Ion Exchange & Granular Activated Carbon <br />Reference: Dan Mueller, PE, City of Downey <br />(562) 904-7110 <br />Project Benefits: <br />• Analyzed Water Quality <br />• Reviewed Well pumps & motors <br />• Analyzed centralized treatment option <br />■ Provided site layouts <br />• Developed Capital & Operations costs <br />City of South Gate I PFAS Compliance Study <br />Owner: City of South Gate <br />Number of Wells: 4 <br />Capacity: 5,000 GPM <br />Status: Study Completed September 2022 <br />Construction Costs: $4.8 million <br />PFAS Treatment: Ion Exchange & Granular Activated Carbon <br />Reference: Chris Castillo, City of South Gate <br />(323) 563-5779 <br />Project Benefits: <br />■ Analyzed Water Quality <br />• Reviewed Well pumps & motors <br />■ Analyzed centralized treatment option <br />• Provided site layouts <br />• Developed Capital & Operations costs <br />• Provided Costs for 1,4-Dioxane treatment if needed in future <br />PFAS Treatment Systems <br />TETRA TECH Page 116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.