Laserfiche WebLink
PROPOSAL FOR <br />On -Call Engineering Design Services <br />Gary ReVoir, PE <br />Technical Advisor/QAIQC <br />Gary has more than 34 years of engineering consulting experience in <br />the municipal sector covering all aspects of public works and utility <br />related projects; particularly drinking water, wastewater, reclaimed <br />water, storm water and solid waste. This experience includes a broad <br />range of engineering and consulting covering the full range of <br />planning, design, permitting, funding support and assistance during <br />construction for various infrastructure projects. His involvement in a <br />number of infrastructure projects nationwide has afforded him <br />additional expertise and industry knowledge to support utility <br />management in all aspects of implementing capital programs at all <br />levels. Mr. ReVoir has a BSE in Environmental Engineering from the <br />University of Florida, a MSE from the University of Central Florida, and <br />is currently a Vice President with Tetra Tech, as well as a member of the I <br />Water Research Foundation. <br />EXPERIENCE <br />PFAS Treatment Systems <br />Education <br />MS, Environmental <br />Engineering, University of <br />Central Florida, 1995 <br />BS, Environmental <br />Engineering, University of <br />Florida, 1988 <br />Registrations <br />Professional Engineer, <br />Florida, No. 46684, 1993 <br />Years of Experience <br />34 <br />3oard of Directors for the <br />Eastern Regional Water Supply Facility, Orange County Utilities, FL. 2022. Technical Advisor. <br />Groundwater treatment facility expansion to 62.5 MGD with master planning for an ultimate capacity of <br />75 MGD. Process facilities occupy a constrained site with adjacent residential properties. Both a <br />conjunctive use study and an evaluation of plant redundancy and reliability were conducted to <br />determine viable preliminary design concepts for facility expansion, <br />Glendale WWTP Dewatering Improvements, City of Lakeland, FL. 2020. Technical Advisor. To <br />increase dewatering capacity and create a permanent situation, the City intends to install a dewatering <br />system, including a centrifuge plus other ancillary equipment as required for a complete system. <br />Centrifuge will be a fixed unit housed within the thickener building that currently houses two belt <br />thickeners. Provided preliminary and final design, permitting, bidding, and construction administration <br />services associated with installation of the centrifuge and associated systems for dewatering the <br />digested sludge at the facility. Dewatering system improvements included new sludge feed pumps <br />housed within the sludge feed pump building which draws sludge from Retention Basin Nos. 4 and 5. <br />Additionally, the City installed a high solids cake conveyance system to transport the dewatered <br />material to a hauling vehicle parked adjacent to the thickening building. Project also included electrical, <br />instrumentation, civil site and yard piping modifications as needed for the proposed sludge mixing, feed, <br />dewatering, and conveyance improvements. <br />Alternative Water Supply Design/Build, City of Tarpon Springs, FL. 2016. Client Manager. Preliminary <br />engineering, final design, permitting, and construction administration. Project consisted of raw water supply <br />wells and a new reverse osmosis WTP capable of treatment up to 6.4 MGD, designed for high salinity <br />groundwater treatment. <br />Cypress Lake Water Treatment Plant, STOPR, City of Kissimmee, FL. 2015. Client Manager. <br />Strategic planning efforts which determined that a regional project yielding a minimum 30 MGD of water <br />supply would help to collectively meet the Utility Partners Joho Water Authority, City of St. Cloud, <br />Orange County Utilities, Polk County, and Reedy Creek Improvement District) needs for the near <br />future, The Groundwater Desalination Regional Alternative Water Supply Preliminary Design Report <br />presents a basis of design, preliminary layout of proposed facilities (buildings, site and yard piping), <br />facility implementation, overview of regulatory requirements, and an estimate of probable capital and <br />O&M costs for the 34 MGD Cypress Lake water treatment plant, welifield, and raw water main, and <br />concentrate disposal facilities. <br />TETRA TECH <br />