Laserfiche WebLink
PROPo5ALFOR <br />On -CO Engineering Design Services PFAS Treatment Systems <br />Amanda Taylor, PE Education <br />Process/Mechanical MS, Environmental <br />Engineering and Science, <br />Amanda is experienced in analysis and process design of various Johns Hopkins University, <br />municipal and industrial water/wastewater projects. Amanda has Baltimore, MD, 2011 <br />experience with traditional and advanced water and wastewater BS, Biological Systems <br />projects, including Title 22, Microfiltration, Ultrafiltration, Reverse Engineering, Virginia <br />Osmosis, and Ultraviolet Treatment. Polytechnic Institute and State <br />University, Blacksburg, VA, <br />EXPERIENCE zoos <br />PFAS On -Call Contract, Orange County Water District, CA. 2021. Registrations <br />Process Engineer for IX/GAC treatment for PFOS and PFOA design Professional Chemical <br />for 18 affected wells in the main Orange County Basin. Projects Engineer, California, <br />included design, estimating of capital and operating costs, No. 67a0, 2015 <br />coordinating with vessel suppliers, and construction management for Professional Engineer, <br />the following projects: Virginia, No. 0402050760, <br />■ Serrano Water District Well #5 and #9 (In Operation): This project 2013 <br />consists of a 3,000 GPM IX System with a bag filter pre-treatment, <br />3,000 GPM Booster Pump Station and new chemical feed system Years of Experience <br />for disinfection. 13 <br />n Kimberley Well 1A (In Operation): Located on a very small site <br />with a single well this facility is designed to produce 3,000 GPM using an IX System with a bag filter <br />pre-treatment and new chemical feed system for disinfection. <br />■ Fullerton Main Plant (Completed Design): The Fullerton Main Plant will treat six onsite wells with a <br />total capacity of 10,100 GPM. PFOS, PFOA and VOCs will be removed using 6 to 12 ft diameter, <br />40,000 Ib. GAC vessels that will discharge into an existing forebay then pumped into the distribution <br />system. The remaining wells will be treated with an IX system consisting of 8 vessels and bag filters <br />for pre-treatment. <br />■ Yorba Linda Water District Headquarters Plant (In Operation): This system will treat water from <br />10 wells with a total capacity of 17,400 GPM. An IX System consisting of 11 pairs of Lead/Lag <br />Vessels (22 vessels total), bag filter pre-treatment, Booster Pump Station, and new Onsite <br />Generation System for chlorine disinfection. In order to get the system on the existing site an <br />extensive analysis of the site improvements was completed. <br />PFAS Study for Wells ET-1, ET-2 and 78, Irvine Ranch Water District, Irvine, CA. 2021. Process <br />Engineer for a study to determine the options to add PFAS treatment to an operating VOC air stripper <br />project. Well ET-1 operates at 2.0 MGD through one tray air stripper that discharges into a small wet <br />well with a single booster pump station. The existing plant is located on a small lot with limited space. <br />Project included analysis of water quality, options for IX or GAC treatment and analysis of adding wells <br />ET-2 and 78 to the project if they become affected by PFAS. Capital and O&M costs were also <br />prepared. <br />PFAS Study for Five Wells, City of Downey, CA. 2021. Process Engineer for a study to determine <br />the options to add PFAS treatment to five existing wells in Downey affected by PFOS and PFOA. Study <br />included analysis of water quality, siting study, comparison of IX and GAC treatment, evaluation of <br />piping wells to a central location for treatment, capital cost estimates, O&M estimates and lifecycle cost <br />analysis. The report was used as an attachment to the City of Downey's funding application to Water <br />Replenishment District of Southern California. <br />Albert Robles Center for Water Recycling and Environmental Learning (Formerly known as <br />GRIP), Water Replenishment District of Southern California, Pico Rivera, CA. 2019. Process <br />Engineer for a new 13,000 acre-feet per year of fully advanced treated recycled water. Treatment <br />process includes influent facilities, MF/UF system, RO system, UV Advanced Oxidation system, <br />past-treatmenVstabilization/disinfection, product water wet well, and brine/waste disposal connection. <br />TETRA TECH <br />