PROPOSAL FOR
<br />On -Call Engineering Design Services PFAS Treatment Systems
<br />Mazen Kassar, PE Education
<br />Electrical, I&C
<br />BS, Electrical Engineering,
<br />California State University,
<br />Mazen has more than 30 years of experience in electrical engineering
<br />Long Beach, 1990
<br />and industry standard that include electrical engineering staff
<br />Registrations
<br />management, project management, construction management and
<br />Professional Electrical
<br />supervision, water and wastewater treatment, petro-chemical design,
<br />Engineer, California,
<br />and environmental soil and groundwater treatment. Mazen's
<br />g
<br />No. 16809, 1998
<br />background includes designing medium and low voltage power
<br />General Construction,
<br />distribution, designing instrumentation, control systems and SCADA
<br />Class California,
<br />stems for a wide -variety of projects, and the installation of electrical
<br />systems Y P j
<br />8
<br />No, 7745, 2008
<br />systems for remediation projects, including soil vapor extraction
<br />Years of Experience
<br />systems and groundwater pump and -treat systems.
<br />EXPERIENCE
<br />30
<br />PEAS On -Call Contract, Orange County Water District, CA. 2021.
<br />Lead Electrical Engineer for IX/GAC treatment for PFOS and PFOA design for 18 affected wells in the
<br />main Orange County Basin. Projects included design, estimating of capital and operating costs,
<br />coordinating with vessel suppliers, and construction management for the following projects:
<br />■ Serrano Water District Well #5 and #9 (In Operation)-. This project consists of a 3,000 GPM
<br />1X System with a bag filter pre-treatment, 3,000 GPM Booster Pump Station and new chemical feed
<br />system for disinfection.
<br />■ Kimberley Well 1A (in Operation): Located on a very small site with a single well this facility is
<br />designed to produce 3,000 GPM using an IX System with a bag filter pre-treatment and new
<br />chemical feed system for disinfection.
<br />■ Fullerton Main Plant (Completed Design): The Fullerton Main Plant will treat six onsite wells with a
<br />total capacity of 10,100 GPM. PFOS, PFOA and VOCs will be removed using 6 to 12 ft diameter,
<br />40,000 lb. GAC vessels that will discharge into an existing forebay then pumped into the distribution
<br />system. The remaining wells will be treated with an IX system consisting of 8 vessels and bag filters
<br />for pre-treatment.
<br />■ Yorba Linda Water District Headquarters Plant (In Operation): This system will treat water from
<br />10 wells with a total capacity of 17,400 GPM. An IX System consisting of 11 pairs of Lead/Lag
<br />Vessels (22 vessels total), bag filter pre-treatment, Booster Pump Station, and new Onsite
<br />Generation System for chlorine disinfection. In order to get the system on the existing site an
<br />extensive analysis of the site improvements was completed.
<br />PFAS Study for Wells ET -'I, ET-2 and 78, Irvine Ranch Water District, Irvine, CA. 2 02 1. Lead
<br />Electrical Engineer for a study to determine the options to add PFAS treatment to an operating VOC air
<br />stripper project. Well ET-1 operates at 2.0 MGD through one tray air stripper that discharges into a
<br />small wet well with a single booster pump station. The existing plant is located on a small lot with
<br />limited space. Project included analysis of water quality, options for IX or GAC treatment and analysis
<br />of adding wells ET-2 and 78 to the project if they become affected by PFAS. Capital and O&M costs
<br />were also prepared.
<br />Well No. 32 Rehabilitation, City of Santa Ana, CA. 2017 - Present. Electrical Project Manager. The
<br />project involved the preparation of a Preliminary Design Report and plans/specifications for the
<br />rehabilitation of the well facility. The underground well would be scraped, cleaned and modified to be
<br />within an above ground CMU block control building (housing mechanical and electrical rooms). The
<br />design also included a separate on -site generation sodium hypochlorite building, 3,500 feet of 12-inch
<br />discharge pipe to John Garthe Reservoir and modification at the reservoir to connect to the on -site
<br />piping.
<br />TETRA TECH