Laserfiche WebLink
PROPOSAL FOR <br />On -Call Engineering Design Services PFAS Treatment Systems <br />Mazen Kassar, PE Education <br />Electrical, I&C <br />BS, Electrical Engineering, <br />California State University, <br />Mazen has more than 30 years of experience in electrical engineering <br />Long Beach, 1990 <br />and industry standard that include electrical engineering staff <br />Registrations <br />management, project management, construction management and <br />Professional Electrical <br />supervision, water and wastewater treatment, petro-chemical design, <br />Engineer, California, <br />and environmental soil and groundwater treatment. Mazen's <br />g <br />No. 16809, 1998 <br />background includes designing medium and low voltage power <br />General Construction, <br />distribution, designing instrumentation, control systems and SCADA <br />Class California, <br />stems for a wide -variety of projects, and the installation of electrical <br />systems Y P j <br />8 <br />No, 7745, 2008 <br />systems for remediation projects, including soil vapor extraction <br />Years of Experience <br />systems and groundwater pump and -treat systems. <br />EXPERIENCE <br />30 <br />PEAS On -Call Contract, Orange County Water District, CA. 2021. <br />Lead Electrical Engineer for IX/GAC treatment for PFOS and PFOA design for 18 affected wells in the <br />main Orange County Basin. Projects included design, estimating of capital and operating costs, <br />coordinating with vessel suppliers, and construction management for the following projects: <br />■ Serrano Water District Well #5 and #9 (In Operation)-. This project consists of a 3,000 GPM <br />1X System with a bag filter pre-treatment, 3,000 GPM Booster Pump Station and new chemical feed <br />system for disinfection. <br />■ Kimberley Well 1A (in Operation): Located on a very small site with a single well this facility is <br />designed to produce 3,000 GPM using an IX System with a bag filter pre-treatment and new <br />chemical feed system for disinfection. <br />■ Fullerton Main Plant (Completed Design): The Fullerton Main Plant will treat six onsite wells with a <br />total capacity of 10,100 GPM. PFOS, PFOA and VOCs will be removed using 6 to 12 ft diameter, <br />40,000 lb. GAC vessels that will discharge into an existing forebay then pumped into the distribution <br />system. The remaining wells will be treated with an IX system consisting of 8 vessels and bag filters <br />for pre-treatment. <br />■ Yorba Linda Water District Headquarters Plant (In Operation): This system will treat water from <br />10 wells with a total capacity of 17,400 GPM. An IX System consisting of 11 pairs of Lead/Lag <br />Vessels (22 vessels total), bag filter pre-treatment, Booster Pump Station, and new Onsite <br />Generation System for chlorine disinfection. In order to get the system on the existing site an <br />extensive analysis of the site improvements was completed. <br />PFAS Study for Wells ET -'I, ET-2 and 78, Irvine Ranch Water District, Irvine, CA. 2 02 1. Lead <br />Electrical Engineer for a study to determine the options to add PFAS treatment to an operating VOC air <br />stripper project. Well ET-1 operates at 2.0 MGD through one tray air stripper that discharges into a <br />small wet well with a single booster pump station. The existing plant is located on a small lot with <br />limited space. Project included analysis of water quality, options for IX or GAC treatment and analysis <br />of adding wells ET-2 and 78 to the project if they become affected by PFAS. Capital and O&M costs <br />were also prepared. <br />Well No. 32 Rehabilitation, City of Santa Ana, CA. 2017 - Present. Electrical Project Manager. The <br />project involved the preparation of a Preliminary Design Report and plans/specifications for the <br />rehabilitation of the well facility. The underground well would be scraped, cleaned and modified to be <br />within an above ground CMU block control building (housing mechanical and electrical rooms). The <br />design also included a separate on -site generation sodium hypochlorite building, 3,500 feet of 12-inch <br />discharge pipe to John Garthe Reservoir and modification at the reservoir to connect to the on -site <br />piping. <br />TETRA TECH <br />