Laserfiche WebLink
PRO PO5ALFOR <br />On -Call Engineering Design Services PFAS Treatment Systems <br />Beverly Encina, PE Education <br />Team 2 Leader BS, Civil Engineering, <br />University of California, Irvine, <br />Beverly is experienced in analysis and design for various types of 2002 <br />public works projects including, but not limited to, water pipeline Registrations <br />distribution systems, water booster pump stations, hydraulic analysis, Professional Civil Engineer, <br />storm drainage system, site improvement design, and membrane California, No. 74408, 2009 <br />treatment plant design. <br />EXPERIENCE Years of Experience <br />20 <br />PFAS On -Call Contract, Orange County Water District, CA. 2021. <br />Project Engineer for IX/GAC treatment for PFOS and PFOA design for 18 affected wells in the main <br />Orange County Basin. Projects included design, estimating of capital and operating costs, coordinating <br />with vessel suppliers, and construction management for the following projects: <br />■ Serrano Water District Well #5 and #9 (In Operation): This project consists of a 3,000 GPM <br />IX System with a bag filter pre-treatment, 3,000 GPM Booster Pump Station and new chemical feed <br />system for disinfection. <br />a Kimberley Well 1A (In Operation): Located on a very small site with a single well this facility is <br />designed to produce 3,000 GPM using an IX System with a bag filter pre-treatment and new <br />chemical feed system for disinfection. <br />■ Fullerton Main Plant (Completed Design): The Fullerton Main Plant will treat six onsite wells with a <br />total capacity of 10,100 GPM. PFOS, PFOA and VOCs will be removed using 0 to 12 ft diameter, <br />40,000 lb. GAC vessels that will discharge into an existing forebay then pumped into the distribution <br />system. The remaining wells will be treated with an IX system consisting of 8 vessels and bag filters <br />for pre-treatment. <br />■ Yorba Linda Water District Headquarters Plant (In Operation): This system will treat water from <br />10 wells with a total capacity of 17,400 GPM. An IX System consisting of 11 pairs of Lead/Lag <br />Vessels (22 vessels total), bag filter pre-treatment, Booster Pump Station, and new Onsite <br />Generation System for chlorine disinfection. In order to get the system on the existing site an <br />extensive analysis of the site improvements was completed. <br />PFAS Study for Wells ET-11, ET-2 and 78, Irvine Ranch Water District, Irvine, CA. 2021. Project <br />Engineer for a study to determine the options to add PFAS treatment to an operating VOC air stripper <br />project. Well ET-1 operates at 2.0 M G D through one tray air stripper that discharges into a small wet <br />well with a single booster pump station. The existing plant is located on a small lot with limited space. <br />Project included analysis of water quality, options for IX or GAC treatment and analysis of adding wells <br />ET-2 and 78 to the protect if they become affected by PFAS. Capital and O&M costs were also <br />prepared. <br />PFAS Study for Five Wells, City of Downey, CA. 2021. Project Engineer for a study to determine the <br />options to add PFAS treatment to five existing wells in Downey affected by PFOS and PFOA. Study <br />included analysis of water quality, siting study, comparison of IX and GAC treatment, evaluation of <br />piping wells to a central location for treatment, capital cost estimates, O&M estimates and lifecycle cost <br />analysis. The report was used as an attachment to the City of Downey's funding application to Water <br />Replenishment District of Southern California. <br />Albert Robles Center for Water Recycling and Environmental Learning (Formerly known as <br />GRIP), Water Replenishment District of Southern California, Pico Rivera, CA. 2019. Project <br />Engineer for a new 13,000 acre-feet per year of fully advanced treated recycled water. Treatment <br />process includes influent facilities, MFIUF system, RO system, UV Advanced Oxidation system, <br />post-treatment/stabilization/disinfection, product water wet well, and brinelwaste disposal connection. <br />TETRA TECH <br />