PROPOSAIFOR
<br />On -Call Engineering Design Services PFAS Treatment Systems
<br />Peter Yu, PE Education
<br />Process/Mechanical BS, Mechanical Engineering,
<br />Cornell University, 2007
<br />Peter is a detail -oriented engineer with 15 years experience in the Registrations
<br />water and wastewater industry including six years managing associate Professional Civil Engineer,
<br />engineers, Peter is a specialist in wastewater and stormwater California, No. 88056, 2017
<br />systems, industrial wastewater regulatory requirements, and water
<br />reduction strategies. Additionally, Peter has experience with indirect Years of Experience
<br />potable reuse, advanced water purification systems, pump stations, 15
<br />conveyance systems, injection and monitoring wells, and wastewater
<br />systems and plants.
<br />EXPERIENCE
<br />PFAS On -Call Contract, Orange County Water District, CA. 2021. Project Engineer for IX/GAC
<br />treatment for PFOS and PFOA design for 18 affected wells in the main Orange County Basin. Projects
<br />included design, estimating of capital and operating costs, coordinating with vessel suppliers, and
<br />construction management for the following projects:
<br />■ Serrano Water District Well #5 and #9 (In Operation): This project consists of a 3,000 GPM IX
<br />System with a bag filter pre-treatment, 3,000 GPM Booster Pump Station and new chemical feed
<br />system for disinfection.
<br />■ Kimberley Well 1A (In Operation): Located on a very small site with a single well this facility is
<br />designed to produce 3,000 GPM using an IX System with a bag filter pre-treatment and new
<br />chemical feed system for disinfection.
<br />■ Fullerton Main Plant (Completed Design): The Fullerton Main Plant will treat six onsite wells with a
<br />total capacity of 10,100 GPM. PFOS, PFOA and VOCs will be removed using 6 to 12 ft diameter,
<br />40,000 Ib. GAC vessels that will discharge into an existing forebay then pumped into the distribution
<br />system. The remaining wells will be treated with an IX system consisting of S vessels and bag filters
<br />for pre-treatment.
<br />■ Yorba Linda Water District Headquarters Plant (In Operation): This system will treat water from
<br />10 wells with a total capacity of 17,400 GPM. An IX System consisting of 11 pairs of Lead/Lag
<br />Vessels (22 vessels total), bag filter pre-treatment, Booster Pump Station, and new Onsite
<br />Generation System for chlorine disinfection. In order to get the system on the existing site an
<br />extensive analysis of the site improvements was completed.
<br />PFAS Study for Five Wells, City of Downey, CA. 2021. Project Engineer for a study to determine the
<br />options to add PFAS treatment to five existing wells in Downey affected by PFOS and PFOA. Study
<br />included analysis of water quality, siting study, comparison of IX and GAC treatment, evaluation of
<br />piping wells to a central location for treatment, capital cost estimates, O&M estimates and lifecycle cost
<br />analysis. The report was used as an attachment to the City of Downey's funding application to Water
<br />Replenishment District of Southern California.
<br />Pure Water Oceanside, Conveyance and Injection Facilities, City of Oceanside, CA.
<br />2019 - Ongoing, Project Engineer. As part of the Pure Water Oceanside project Tetra Tech designed
<br />the pipelines that will be constructed as part of the Advanced Water Purification Facility (AWPF) that
<br />convey the advanced treated water to the existing Lower Recycled Water Pump Station and to the
<br />Upper Recycled Water Pump Station that will be built along with the AWPF. In addition, Tetra Tech
<br />designed three new injection wells (Well 1, Well 3 and Well 6) and conveyance pipelines to the wells,
<br />totaling a maximum capacity of 6.0 MGD.
<br />Albert Robles Center for Water Recycling and Environmental Learning (Formerly known as
<br />GRIP), Water Replenishment District of Southern California, Pico Rivera, CA. 2019. Project
<br />Engineer for a new 13,000 acre-feet per year of fully advanced treated recycled water. Treatment
<br />process includes influent facilities, MFIUF system, RO system, UV Advanced Oxidation system,
<br />post-treatment/stabilization/disinfection, product water wet well, and brine/waste disposal connection.
<br />TETRA TECH