My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 19 - Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:43:44 AM
Creation date
8/10/2023 5:12:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana - Well #26 PFAS IX Treatment Plant <br />TETRATECH drawing Sheet Count <br />30% Des i n <br />30% Oesl n <br />60% Design <br />913% DesIgn <br />100% Des f n <br />Sequentlal <br />Number <br />Subset <br />Count <br />Sheet <br />Number <br />Description <br />Planned <br />Planned <br />Planned <br />Planned <br />Planned <br />General <br />1 <br />1 <br />G-000 <br />TrtleSheet <br />10% <br />30% <br />60% <br />90% <br />100% <br />2 <br />2 <br />G-OD1 <br />Sheet Index, Vicinity Map & Location Map <br />10% <br />30% <br />60% <br />90% <br />100% <br />3 <br />3 <br />G-002 <br />General Notes and Erasion Control Notes <br />90% <br />100% <br />4 <br />4 <br />G-003 <br />Standard Drawings, Symbols, Abbrevlati o n5, & Survey Data <br />60% <br />901A <br />IOG% <br />5 <br />5 <br />G-004 <br />Process Flow Diagram <br />10°% <br />30% <br />60% <br />90% <br />100% <br />6 <br />5 <br />G-005 <br />14orixontaI Control Plan <br />90% <br />IOD% <br />Clvl1 <br />7 <br />1 <br />C-101 <br />Site Demolition Plan <br />10% <br />30% <br />60% <br />90% <br />100% <br />8 <br />2 <br />C-102 <br />IDemoiltion Details 1 <br />60% <br />90% <br />100% <br />9 <br />3 <br />C•103 <br />IDemoiltion Details 2 <br />60% <br />90% <br />100% <br />10 <br />4 <br />C-104 <br />Proposed Slte Plan <br />10% <br />30% <br />60% <br />90% <br />100% <br />11 <br />5 <br />C-105 <br />Yard Plialng Plan <br />10% <br />30% <br />60% <br />90% <br />3.00% <br />12 <br />6 <br />C-301 <br />Yard PI log Profiles <br />90% <br />190% <br />13 <br />7 <br />C-501 <br />Civil Details 1 <br />60% <br />90% <br />100% <br />14 <br />8 <br />C-502 <br />Civil Details 2 <br />90% <br />100% <br />15 <br />9 <br />C-SG3 <br />Civil Details 3 <br />90% <br />100% <br />16 <br />10 <br />C-504 <br />Connection Details <br />160% <br />90% <br />100% <br />17 <br />11 <br />C-505 <br />Connection Details <br />160% <br />90% <br />100% <br />Structural <br />18 <br />1 <br />S-001 <br />General Structural Notes <br />10% <br />30% <br />60% <br />90% <br />1D0% <br />19 <br />2 <br />S-002 <br />Speciallnspection&Structural0bservations <br />6G% <br />90% <br />1D0% <br />20 <br />3 <br />5.101 <br />Foundatlon Plan <br />10% <br />30% <br />60% <br />90% <br />SOW% <br />21 <br />4 <br />S-301 <br />Sectlons <br />60% <br />90% <br />100% <br />22 <br />5 <br />5.501 <br />Structural Details 1 <br />90% <br />100% <br />23 <br />6 <br />5-502 <br />Structural Details 2 <br />90% <br />100% <br />24 <br />7 <br />5-503 <br />Structural Details 3 <br />90% <br />1013% <br />Methanicaf <br />Process <br />25 <br />1 <br />D-100 <br />I Overa11ProcessPlan <br />101A <br />30% <br />50% <br />90% <br />100% <br />26 <br />2 <br />0-101 <br />Pump Modifications Plan & Sectlon <br />50% <br />M% <br />100% <br />27 <br />3 <br />❑-103 <br />PFAS Vessel Process Plan <br />10% <br />30% <br />6D% <br />90% <br />100% <br />28 <br />4 <br />❑-1G4 <br />Pretreatment Process Plan <br />60% <br />9G% <br />100% <br />29 <br />5 <br />❑-1G5 <br />Booster Pumps Plan <br />10% <br />M% <br />60% <br />901A <br />10D% <br />30 <br />5 <br />0-1G6 <br />Sand Separator <br />31 <br />7 <br />D-3G1 <br />PFAS Vessel Process Settlon5 <br />ID% <br />30% <br />GO% <br />90% <br />100% <br />32 <br />8 <br />A-3D2 <br />PFAS Vessel Process Sections <br />90% <br />100% <br />33 <br />9 <br />0-303 <br />I Booster PUMP Sections <br />601A <br />90% <br />100% <br />34 <br />30 <br />0-304 <br />Process Piping Sections <br />60°/e <br />90% <br />IOG% <br />35 <br />11 <br />D-5D3 <br />Process Detalls 1 <br />90% <br />100% <br />36 <br />12 <br />D-SD2 <br />Process Detalls 2 <br />90% <br />100% <br />37 <br />13 <br />D-901 <br />Treatment Plant 3D Perspective <br />Do% <br />100% <br />Electrical <br />38 <br />1 <br />E-001 <br />Electrical Symbols, Notes & Abbrevlations <br />10% <br />30% <br />50% <br />90% <br />100% <br />39 <br />2 <br />E-101 <br />Electrical Site Demolition Plan <br />60% <br />901A <br />IOD% <br />4G <br />3 <br />E•103 <br />jElectrltal Overall5lte Plan <br />10% <br />301A <br />60% <br />90% <br />100% <br />41 <br />4 <br />E-104 <br />Vessels Electrical Plan <br />601A <br />90% <br />100% <br />42 <br />5 <br />E-1.05 <br />Emerge ncyGenerator <br />10% <br />30% <br />43 <br />6 <br />E-201 <br />Panel& Conduit Schedule <br />60% <br />90% <br />100% <br />44 <br />7 <br />E-202 <br />Panel & Conduit Schedule <br />90% <br />IOG% <br />45 <br />8 <br />E-501 <br />Electrical Detail% <br />60% <br />901A <br />100% <br />46 <br />9 <br />E-502 <br />Electrical Details <br />901A <br />100% <br />Instrumentation <br />47 <br />1 <br />1001 <br />MID Symbols & Abbrevlatlons <br />10% <br />301A <br />WA <br />9D% <br />100% <br />48 <br />2 <br />I.101 <br />MID Pretreatment & Sand Separator <br />10% <br />30% <br />60% <br />9D% <br />100% <br />49 <br />3 <br />I-102 <br />P&I D PFAS Treatment <br />10% <br />30% <br />60% <br />90% <br />IOG% <br />50 <br />4 <br />1-103 <br />P&ID Booster Pumps <br />101A <br />30% <br />60% <br />90% <br />IOG% <br />51 <br />5 <br />1-104 <br />P&I❑ Chemical Facilities <br />50% <br />901/. <br />100% <br />52 <br />6 <br />1-105 <br />P&I D EHI ue nt Modificatlo ns <br />60% <br />90% <br />100% <br />Traffic Control <br />Plans <br />53 <br />1 <br />1.001 <br />Traf£rc Control Notes <br />goy <br />100% <br />54 <br />2 1 <br />1.101 ITraffIc <br />Control Plan 1 <br />90% <br />IOG% <br />55 <br />3 1 <br />1-102 ITraffic <br />Control Plan 2 <br />90% <br />I00% <br />TotaIDrawing CaLint 19 19 36 53 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.