My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Downtown Flood Reduction and Stormwater Infiltration Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/21/2023 Special and Regular
>
Item 15 - Downtown Flood Reduction and Stormwater Infiltration Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:27:22 AM
Creation date
8/11/2023 8:38:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
15
Date
3/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-6622 <br />DOWNTOWN FLOOD REDUCTION AND STORMWATER INFILTRATION <br />TOTAL BASE BID S 4,458,844.00 <br />TOTAL ADD ALTERNATE BID S `€83,800.00 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (If any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "251/o" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />Labor for planting all 1-gallon, 5-gallon, and 15-gallon Shrubs, Ornamental Grasses, and <br />Ground Covers as shown per plan shall be performed by the OCCC. The Contactor shall be <br />responsible for planting all Trees as shown per plan. For the landscaping bid items, only the <br />price to furnish the materials for the installation of the 1-gallon, 5-gallon, and 15-gallon <br />planting shall be included. The labor for the OCCC installation work for 1-, 5-, and 15-galIon <br />plants is included in Bid Item 59. <br />f This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within 200 working days after the commencement date stated in the Notice to <br />Proceed. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $4,800 per calendar day_ <br />Name ofFirm GMZ Engineering, Inc. <br />Signature of BIDDER <br />Title Ghazi Mubarak - President. Vice President, Secretary, Treasurer <br />(If an individual, so state. If firm or co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If corporation, state legal name ofcorporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />P-5 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.