CITY OF SANTA ANA
<br />PROPOSAL
<br />PROJECT NO.: 22-6622
<br />DOWNTOWN FLOOD REDUCT[ON AND STORMWATI R INFILTRATION
<br />Item
<br />Description
<br />Qty
<br />Chit
<br />Unit Price
<br />Amount
<br />15
<br />Install Shoring for Underground Storage
<br />7,865
<br />5F
<br />5
<br />Reservoir*
<br />uO.OD
<br />3'93,250.00
<br />17
<br />Install 8" 5DR35 PVC Pipe Inc[.
<br />151
<br />LF
<br />$
<br />5
<br />Trenching, Renick,als, Bedding, and
<br />355.00
<br />65,115.00
<br />Backfill
<br />18
<br />Instal 18" DIP [CL250] Incl. Trenching,
<br />47
<br />LF
<br />S
<br />$
<br />Removals, Bedding, Backfill, and
<br />535.00
<br />26,145.00
<br />Pavement Re luuemcnt
<br />19
<br />Install 18" RCP (2500-D) Incl. Trenching,
<br />367
<br />LF
<br />S
<br />S
<br />Removals, Bedding, Backfill, and
<br />460.00
<br />168,820.00
<br />Pavement Replacement
<br />20
<br />Install 21" RCP (2000-13) Inal, Trenching,
<br />10
<br />LF
<br />S
<br />S
<br />Removals, Bedding, Back -fill, and
<br />490.00
<br />4,900.00
<br />Pavement Replacement
<br />21
<br />Install 24" RCP (2000-D) Incl, Trenching.
<br />102
<br />LF
<br />S
<br />S
<br />Removals, Bedding, Backfill, and
<br />520.00
<br />5.3,040.00
<br />Pavement Rc lacement
<br />22
<br />Install 30" RCP (2000-D) Tncl. Trenching,
<br />310
<br />LF
<br />$
<br />$
<br />Removals, Bedding, Backfill, and
<br />590.00
<br />182,900 00
<br />Pavement R❑ lacement
<br />23
<br />Install 3G" RCP (2000-D) Incl. Trenching,
<br />295
<br />LF
<br />$
<br />$
<br />Removals, Bedding, Backfill, and
<br />675.0C
<br />'199,125,00
<br />Pavement Replacement
<br />24
<br />Install 39" RCP (2000-D)1ncl. Trenching,
<br />10
<br />LF
<br />$
<br />$
<br />Removals, Bedding, BackGll, and
<br />540,00
<br />5,400,t70
<br />Pavement Replacement
<br />25
<br />Construct Concrete Collar
<br />8
<br />EA
<br />$
<br />3.afa0.ao
<br />$
<br />24.000.I)0
<br />26
<br />Construct Junction Structure Per SPPWC
<br />l
<br />EA
<br />$
<br />$
<br />Std. Plan 331-3
<br />5,000•00
<br />5,000.00
<br />27
<br />Construct Type A Junction Chamber IncL
<br />5
<br />EA
<br />S
<br />$
<br />Excavation, Removals, Backfill, and
<br />22 50C C0
<br />112.500.00
<br />Pavement Replacement
<br />28
<br />Construct Type B Junction Chamber Incl.
<br />I
<br />EA
<br />$
<br />S
<br />Excavation, Removals, Backfill, and
<br />25,000_00
<br />25,000.00
<br />Pavement Replacement
<br />29
<br />Construct Low Flow Diversion Vault Inc].
<br />1
<br />EA
<br />S
<br />S
<br />Excavation. Removals, Backfill. and
<br />21,500.90
<br />21 500.00
<br />Pavement Replacement
<br />30
<br />Construct Low Flow Diversion iv1H Incl.
<br />1
<br />EA
<br />$
<br />S
<br />Excavation. Removals. Backfill, and
<br />�
<br />22, 500.00
<br />22, 500.00
<br />Pavement Replacement
<br />31
<br />Install 15"X 18" Grated Catch Basin n ith
<br />2
<br />EA
<br />S
<br />S
<br />Catch Basin Filler Insert (DEdcastle
<br />500 00
<br />15 000.00
<br />FloGard or approved equal) Incl,
<br />Excavatian. Removals, and Backfill
<br />32
<br />Install 18"x18" Grated Catch Basin :fir
<br />?
<br />EA
<br />S
<br />S
<br />Vent with Catch Basin Filter Insert
<br />(dldcastle FloGard or approved equal)
<br />�.500.00
<br />15,000.00
<br />Incl. Incl. Excavation, Removals, and
<br />Backfill
<br />P-2 o l' P-19
<br />
|