My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Downtown Flood Reduction and Stormwater Infiltration Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/21/2023 Special and Regular
>
Item 15 - Downtown Flood Reduction and Stormwater Infiltration Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:27:22 AM
Creation date
8/11/2023 8:38:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
15
Date
3/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Downtown Flood Reduction and Stormwater Infiltration Project <br />March 21, 2023 <br />Page 4 <br />The current fiscal year funding is available in the FY 2022-23 budget and future fiscal <br />year funding will be included in the proposed budgets for City Council consideration. <br />Fiscal <br />Accounting Unit - <br />Fund <br />Accounting Unit -Account <br />Year <br />Account No. <br />Description <br />No. Description <br />Amount <br />(Project No.) <br />Prior Authorized Funds <br />16417644-66220 <br />PWA <br />CNRA Urban Flood <br />2021-22 <br />(22 6622) <br />Enterprise <br />Protection, Improvements <br />$3,800,000 <br />Capital Grants <br />Other Than Building <br />Appropriation Adjustments <br />16417644-66220 <br />PWA <br />CNRA Urban Flood <br />2022-23 <br />(22 6622) <br />Enterprise <br />Protection, Improvements <br />$1,250,000 <br />Capital Grants <br />Other Than Building <br />Federal Clean <br />Federal Clean Water <br />2022-23 <br />05717640-66220 <br />Water <br />Protection Enterprise, <br />$900,000 <br />(22-6622) <br />Protection <br />Improvements Other Than <br />Enterprise <br />Building <br />Total <br />$5,950,000 <br />EXHIBIT(S) <br />1. <br />Location Map <br />2. <br />Bid Proposal <br />3. <br />Construction Contract <br />4. <br />Cost Analysis <br />5. <br />FY 2021-22 C I P Sheet <br />Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency <br />Approved By: Kristine Ridge, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.