CITY OF SANTA ANA
<br />PROPOSAL
<br />PROJECT NO.: 22-6622
<br />DOWNTOWN FLOOD REDUCTION AND STORMWATER INFILTR-ATION
<br />Item
<br />Description
<br />Qty
<br />Unit
<br />Unit Price
<br />Amount
<br />16
<br />Install Shoring for Underground Storage
<br />7,865
<br />SF
<br />$
<br />$
<br />Reservoir*
<br />50 00
<br />393,250 00
<br />17
<br />Install 8" 5DR35 PVC Pipe Incl.
<br />151
<br />LF
<br />$
<br />$
<br />Trenching, Removals, Bedding, and
<br />355.00
<br />55,115.00
<br />Backfill
<br />18
<br />Install 18" DIP (CL.250) Incl. Trenching,
<br />47
<br />LF
<br />$
<br />S
<br />Removals, Bedding, [Backfill, and
<br />535.00
<br />25,145.00
<br />Pavement Re lacement
<br />19
<br />Install 18" RCP (2500-D) Incl. Trenching,
<br />367
<br />LF
<br />$
<br />S
<br />Removals, Bedding, Backfill, and
<br />450.00
<br />1 G8 820 00
<br />Pavement Replacement
<br />20
<br />Install 21" RCP (2000-D) Incl. Trenching,
<br />IO
<br />LF
<br />$
<br />S
<br />Removals, Bedding, Backfill, and
<br />490.00
<br />4,900.00
<br />Pavement Re lacement
<br />21
<br />Install 24" RCP (2000-D) Incl. Trenching,
<br />102
<br />LF
<br />$
<br />S
<br />Removals, Bedding, Backfill, and
<br />520,00
<br />53,040.00
<br />Pavement Replacement
<br />22
<br />Install 30" RCP (2000-D) Incl. Trenching,
<br />310
<br />LF
<br />$
<br />$
<br />Removals, Bedding, Back Fill, and
<br />590.00
<br />1$2,900.00
<br />Pavement Replacement
<br />23
<br />Install 36" RCP (2000-D) Incl. Trenching,
<br />295
<br />LF
<br />$
<br />$
<br />Removals, Bedding, Backfill, and
<br />675.00
<br />199,125,00
<br />Pavement Replacement
<br />24
<br />Install 39" RCP (2000-D) Incl. Trenching,
<br />10
<br />LF
<br />$
<br />$
<br />Removals, Bedding, Backfill, and.
<br />540.00
<br />5,400.00
<br />Pavement Replacement
<br />25
<br />Construct Concrete Collar
<br />8
<br />EA
<br />$
<br />3,000.00
<br />$
<br />24,000_00
<br />26
<br />Construct Junction Structure Per SPPWC
<br />t
<br />EA
<br />$
<br />$
<br />Sid. Plan 331-3
<br />5.000.00
<br />5,000.00
<br />27
<br />Construct Type A Junction Chamber Incl.
<br />5
<br />EA
<br />$
<br />$
<br />Excavation, Removals, Backfill, and
<br />22 500 00
<br />112,500.00
<br />Pavement Replacement
<br />28
<br />Construct Type B Junction Chamber Incl.
<br />I
<br />EA
<br />$
<br />$
<br />Excavation, Removals, Backfill, and
<br />25.000.00
<br />25,000.00
<br />Pavement Replacement
<br />29
<br />Construct Low Flow Diversion Vault Incl.
<br />1
<br />EA
<br />$
<br />S
<br />Excavation, Removals, Backfill, and
<br />21,500.00
<br />21,500.00
<br />Pavement Replacement
<br />30
<br />Construct Low Flow Diversion lvll-1 Incl.
<br />I
<br />EA
<br />$
<br />S
<br />Excavation, Removals, Backfill, and
<br />22,500.00
<br />22.500.00
<br />Pavement Replacement
<br />31
<br />Install 18"X 13" Grated Catch Basin with
<br />2
<br />EA
<br />S
<br />S
<br />Catch Basin Filter Insert (Qldcastle
<br />7,500.00
<br />15,000.00
<br />FloGard or approved equal) Incl.
<br />Excavation, Removals, and Backfill
<br />32
<br />Install 18"xl8" Grated Catch Basin Air
<br />2
<br />EA
<br />$
<br />S
<br />Vent with Catch Basin Filter Insert
<br />7,500.00
<br />15,000.00
<br />(01dcastle F1oGard or approved equal)
<br />Incl. Incl. Excavation, Removals, and
<br />Backfill
<br />P-2 of P- 19
<br />
|